Baseline HVAC type
NC-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
Hello Marcus. We have a healt care building and I would like to know if my baseline HVAC model approach is correct. The building has 12 floors.
Cogen Gas Rates
NC-2009 EAp2:Minimum Energy Performanceposted by Wes Lawson on
Hello all, We are attempting to model a cogen system (using gas to create electricity and using waste heat for domestic water heating). My questions are as follows: 1.
LEED EBOM application day
EBOM-2009 MPR5:Must comply with minimum occupancy ratesposted by Geraldine Seguela RAIA on
We are a newly built hospital overseas. We have completed construction last April. But we're not operating yet.
Anti-corrosive primer and paint on external metal elements
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Joanna Bloniewska on
We need to apply an anti-corrosive primer and paint on metal elements, which are anchored into external face of main precast structure.
Borrowed Daylight
NC-v4 EQc7:Daylightposted by Razan Nejem on
when demonstrating a daylight simulation, shall the interior glazed areas be excluded from the calculation because light traveled through multiple layers of glazing
Vending machines
EBOM-2009 MRc5:Sustainable Purchasing—Foodposted by Andres Giraldo on
Hi, I am wondering if this credit can be earned when the facility have some vending machines which provide beverages and snacks for the employees, but the company doesn't provide any other kind of
Recycling rooms to suit tenant fitout needs
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Larry Jones on
We are working on an office CS project which is being built to suit for a single tenant.
Rainwater capture artificial retention pond
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by John Covello on
Hello, We are looking to use rainwater capture to provide for our site's sanitation and irrigation needs. There is no potable water actually available for the site currently from local sources.
All sanitary installations will only be built at tenant fit-out
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Mark Frey on
We are working on the LEED Core&Shell (v3, 2009) project in Switzerland .
Water heating equipment efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Renato Sandoval on
As a non-us consultant I always have a problem attending the EA.P2 requirement.