CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Ruben Garza on
If Ihave a project that is going into a brand new development where the tenant space simply has open stud exterior walls and storefront and no slab or ceilings (only exposed podium concrete deck)..
VAV minimum flow set points
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, Appendix G3.1.3.13 says "Minimum volume setpoints for VAV reheat boxes shall be 2.15 L/s·m2 of floor area served or the minimum ventilation rate, whichever is larger" When you have a HVAC sys
Energy & Atmosphere
NC-2009 EAp2:Minimum Energy Performanceposted by GOVINDACHARI SUNDARARAJAN on
I am appearing for LEED GA Exam on June-9th 2014, i need a clarification as below, in this website in EA and in each of the credit like EA: Pre requisite-2: Min Energy Performance There are option
Project Incomplete Before End of Performance Period
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Greengrade User on
Do all the purchases of materials that will be needed for a construction project need to be made during the performance period?
Calculating "Other USGBC approved multi-attribute cert" products
Pilot-Credits MRpc80:Environmentally preferable interior finishes and furnishingsposted by Vince Briones on
Has anyone undergone review with this credit yet?
IBC Occupancy Classification & Testing Requirements
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Zach Hoffman on
I am wondering if IBC Group S-1 Occupancy zones are required to be tested per IEQc3.2. On this project (vehicle maintenance facility), the specific zones within the S-1 classification are maintenan
Waste stream audit
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by Michael Smithing on
We have been unable to achieve the waste stream audit credit in Hungary as waste haulage is government controlled and the waste haulers are unable (or unwilling) to provide this service.
food contact sanitizers
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Michelle Raigosa on
Does anyone know of an approved food contact sanitizer or of a standard that certifies this type of sanitzer? Green Seal indicated they did not have one.
Changes in development program form
ND-v2009 PIf1:Development Program and Site Typeposted by Carole Frising on
I just started working on a LEED ND project for which the Masterplan has evolved after the SLL prerequisite submission.
Green-e Energy
NC-2009 EAc6:Green powerposted by PATRICK HILLIER on
We are looking at purchasing thew power for credit EAc6. 1. Can we as the A/E purchase it for the Owner? 2. How do you document the ID credit for 100% power purchased for 2 years?