Forum quick links
posted signage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by yukari kubo on
we are building a campus of buildings (non-school) that has a non smoking policy except in one designated outside area.
FTE in a religious facility
NC-2009 PIf3:Occupant and Usage Dataposted by Donald Green on
I am looking for guidance on how to calculate FTE in a religious facility on a university campus whereby attendees are there for 2 hours each day based on their religion.
HVAC system in a core and shell warehouse
NC-2009 EAp2:Minimum Energy Performanceposted by Isabel Santos on
Dear all, I am developing a simulation of a warehouse (core and shell) that is still under construction. At this stage, it has not yet been defined any tenant.
smoking signage
CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by yukari kubo on
I am working on the new construction of a campus (non school). At the entry into the campus, there is a posted sign stating no smoking.
ITE Analysis
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Ellen Mitchell on
Hi Tristan, I am looking for information on the ITE study for a project in Mexico. When I click on the "LEEDuser's analysis of the ITE study" link located in FAQs, nothing happens.
Calculating Bike Storage for a Higher Education Student Dorm
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Clara Simon on
Please clarify the formula for calculating bike storage for a university student dormitory.
Utility Trenches OK Beyond Boundary?
Schools-2009 MPR3:Must use a reasonable site boundaryposted by Larry Turbes on
Are utility trenches such as sanitary service lines required to be within the Project Boundary?
When your manufacturer doesnt have SRI values
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Erin D. on
In regards to this credit the LEED REFERENCE GUIDE FOR BUILDING DESIGN & CONSTRUCTION WITH GLOBAL ALTERNATIVE COMPLIANCE PATHS for LEED 2009 says that "Projects outside the U.S.
Chiller Minimum Equipment Efficiency nonstandard conditions
NC-2009 EAp2:Minimum Energy Performanceposted by Adriana Hansen on
The project team has specified a centrifugal chiller of over 600 Tons with a nonstandard conditions. It has been sent an AHRI certificate showing the compliance with ASHREA 90.1-2007 and 2010.
Blinds
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Mike D on
If blinds are installed, are the views calculations affected?