Can your contractor upload their own MR Calculator?

NC-2009 MRc4:Recycled Content
posted by  Miriam Gee  on 

Does anyone know if the contractor can upload an internal MR Calculator for MRc4-7, or do they have to download the excel spreadsheet from the Credit Resources tab in LEED Online, complete it, and

1
Fri Jun 6, 2014, 10:48 am

Short term bicycle storage

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Tyra Sorensen  on 

Is short term bicycle storage required or just a good/nice idea? Is there guidance on where in a parking garage the bicycle storage can/should be?

1
Fri Jul 25, 2014, 4:24 am

Air Purifiers? Dehumidifiers?

EBOM-2009 IEQp3:Green Cleaning Policy
posted by  Nate Gillette  on 

Going on a limb here - anyone ever seen these accepted as cleaning equipment? If yes, how did it turn out? Thanks!

1
Thu Dec 4, 2014, 6:07 pm

metal wall louvers

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

In the building that I’m modeling there are metal wall louvers. Some of them are connected to ductwork (for ventilation), some of them ventilate directly technical rooms.

1
Wed Jun 11, 2014, 12:53 pm

Can you pursue LEED CI without any plumbing work?

Retail-CI-v2009 WEc1:Water use reduction
posted by  Karl Heitman  on 

If a tenant in our LEED NC Certified building wants to pursue LEED CI but doesn't have any plumbing work due to all bathrooms and process water included in LEED NC, how to you comply for WEp1?

1
Tue Jun 10, 2014, 11:54 am

LEED NC 2009 EAc5 Measurement and Verification

NC-2009 EAc5:Measurement and Verification
posted by  Jim Gardler  on 

We have developed a M&V plan for a mixed use Multi tenant high rise with commercial space in the building with the International Performance Measurement and Verification Protocol (IPMVP) as the

1
Mon Jun 16, 2014, 9:35 pm

Location of Parking Lot

Pilot-Credits PC14:Walkable Streets
posted by  Walter Parks  on 

We are developing an existing Historic building. The building and parking are already set up on the site and the parking lot is on the side of the building but fronts on the street.

0

EBOM Credit MRp2 Solid Waste Management Policy

NC-2009 IDc1:Innovation in Design
posted by  Sara Goenner Curlee  on 

I am working on a NCv2009 project, and it is considering using MRp2 Solid Waste Management Policy as an Innovation Credit. I have a two part question.

1
Sat Jul 26, 2014, 5:46 am

Hot Humid, Multi Family Compliance

Mid-Rise-v4 EQp1:Ventilation
posted by  Jason Biondi  on 

Will direct kitchen exhaust be required for multi family, hot/humid, mid rise projects, pursuing the natural ventilation approach to compliance with IEQ Ventilation prereq.? Best regards Jason

1
Tue May 9, 2017, 5:33 pm

EAc1 error on template

NC-2009 EAc1:Optimize Energy Performance
posted by  LEED Pro Consultant  on 

Hello! I am having problems with the EAc1 template. The EAp2 and EAc1 reports 2 points for a 12.3% savings of a Major Renovation.

1
Mon Jun 9, 2014, 11:09 pm