Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Fundamental Refrigerant Management: Leed v4- Campus Credit

EBOM-v4 EAp4:Fundamental refrigerant management
posted by  Patricia Andrasik  on 

We are attempting to get the Fundamental Refrigerant Management credit as a campus credit. We are going to peruse the economic feasibility option with leakage tracking.

1
Wed Jun 11, 2014, 4:54 pm

Baseline for Ventilation Fan unconditioned space?

NC-2009 EAp2:Minimum Energy Performance
posted by  Zonda E. Team  on 

What is the baseline for a ventilation fan providing outdoor air to an unconditioned space?

1
Wed Jun 11, 2014, 1:01 pm

Solar Powered Task Lighting

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Chris Brown  on 

Would Solar powered task lighting be acceptable for individual workstations in order to comply with this credit?

1
Wed Jun 11, 2014, 7:16 pm

IEQ Prerequisite 1 – Minimum Indoor Air Quality Performance

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Harsharan Kaur  on 

We are working on a Project, in which most of the rooms are complying with the ASHRAE 62.1-2007 Natural Ventilation requirements, stated under the IEQ Prerequisite 1 – Minimum Indoor Air Quality Pe

1
Wed Jun 11, 2014, 7:08 pm

copy paste

Retail-CI-v4 LTc5:Reduced parking footprint
posted by  manuel de jesus gonzalez duron  on 

this credit is the same has Access to quality transit

0

Energy Star's Portfolio Manager Tool

CS-2009 PIf1:Minimum Program Requirements
posted by  Kathryn Van Nelson  on 

Who exactly registers a project with Energy Star's Portfolio Manager Tool?

1
Mon Jan 19, 2015, 7:19 pm

Manufacturer Declaration

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Lilian Seow  on 

The tile contractor says they can't disclose their floor tile and stone supplier information.

1
Sat Jul 26, 2014, 12:05 pm

parking rainwater

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  jorge calderon  on 

For table SSC6.2-1, we dont know how to describe BMP neither its TSS removal efficiency, because the rain water from the parking is directed and collected to be sent to a vegetated site outside the

1
Wed Jul 2, 2014, 12:42 pm

90% refer to what?

Pilot-Credits WEpc10:Sustainable wastewater management
posted by  Jens Apel  on 

I am wondering what the 90% in option 2 refer to. If I collect and use rainwater, I may use 90% of the annual rainwater on the site.

0

applying only for EAc5.2 not EAc5.1

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Anna Bak  on 

Hi! Do you know if we can apply for EAc5.2 without applying for EAc5.1? The Investor doesn't want to pay for the model callibration, therefore we will not apply for EAc5.1.

1
Thu Jun 12, 2014, 2:27 pm