Forum quick links
Fundamental Refrigerant Management: Leed v4- Campus Credit
EBOM-v4 EAp4:Fundamental refrigerant managementposted by Patricia Andrasik on
We are attempting to get the Fundamental Refrigerant Management credit as a campus credit. We are going to peruse the economic feasibility option with leakage tracking.
Baseline for Ventilation Fan unconditioned space?
NC-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
What is the baseline for a ventilation fan providing outdoor air to an unconditioned space?
Solar Powered Task Lighting
CI-2009 IEQc6.1:Controllability of Systems—Lightingposted by Chris Brown on
Would Solar powered task lighting be acceptable for individual workstations in order to comply with this credit?
IEQ Prerequisite 1 – Minimum Indoor Air Quality Performance
NC-2009 IEQp1:Minimum IAQ Performanceposted by Harsharan Kaur on
We are working on a Project, in which most of the rooms are complying with the ASHRAE 62.1-2007 Natural Ventilation requirements, stated under the IEQ Prerequisite 1 – Minimum Indoor Air Quality Pe
copy paste
Retail-CI-v4 LTc5:Reduced parking footprintposted by manuel de jesus gonzalez duron on
this credit is the same has Access to quality transit
Energy Star's Portfolio Manager Tool
CS-2009 PIf1:Minimum Program Requirementsposted by Kathryn Van Nelson on
Who exactly registers a project with Energy Star's Portfolio Manager Tool?
Manufacturer Declaration
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Lilian Seow on
The tile contractor says they can't disclose their floor tile and stone supplier information.
parking rainwater
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by jorge calderon on
For table SSC6.2-1, we dont know how to describe BMP neither its TSS removal efficiency, because the rain water from the parking is directed and collected to be sent to a vegetated site outside the
90% refer to what?
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Jens Apel on
I am wondering what the 90% in option 2 refer to. If I collect and use rainwater, I may use 90% of the annual rainwater on the site.
applying only for EAc5.2 not EAc5.1
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Anna Bak on
Hi! Do you know if we can apply for EAc5.2 without applying for EAc5.1? The Investor doesn't want to pay for the model callibration, therefore we will not apply for EAc5.1.