clarification question on credit

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Melissa Elkins  on 

Our Engineering firm didn't include our water heating system in the original commissioning report, so our credit needs to be clarified - they did conduct a functional test so I'm wondering if I jus

1
Fri Jun 13, 2014, 12:23 pm

Disinterested Sub-contractor of MEP Design Firm?

NC-2009 EAc3:Enhanced Commissioning
posted by  Anthea Ng  on 

Hello. For achieving EA C3 Enhanced Commissioning, Wwe noted the clause in guidebook "Must not be an employee of the design firm, though he or she may be contracted through them".

1
Fri Jun 13, 2014, 12:37 pm

Ventilation - Proposed and Baseline per ASHRAE 62.1-2007?

NC-2009 EAp2:Minimum Energy Performance
posted by  Todd Tewksbury  on 

Hi! I am conducting a LEED v2009 EAp2/c1 energy model for a nonresidential building that is more than 5 floors.

1
Tue Jun 17, 2014, 1:46 pm

Expansion project FLUSH OUT

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Jorge Torres-Coto  on 

We have a project that is an expansion to an existing facility. It is NOT an addition.

0

Multi zone or 100%OA ?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  SW LEE  on 

Our project is use VRF system to keep the space cool. We also provide dedicated injection fan (DOAS) as to meet 62.1 requirement. Most space will have indoor cassette unit.

1
Tue Jun 17, 2014, 3:06 pm

Increasing the indoor operative temperature

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Stella Stella  on 

Hi, we are doing a project in South east Asia for LEED NC.

1
Wed Jun 25, 2014, 12:53 am

Off-Site Parking

NC-2009 PIf2:Project Summary Details
posted by  Mary Kay  on 

My project is new construction - a hangar at an airport that will be used for painting jet airplanes. The owner already has previously built a building adjacent to our site with a parking lot.

1
Mon Jun 16, 2014, 7:20 pm

Freight and tax on wood invoices

NC-2009 MRc7:Certified Wood
posted by  Renee Shirey  on 

The wood invoices that I have show a separate line item for tax/fuel charge/freight charges, etc. and I was unclear how to include this in the documentation.

1
Tue Jun 24, 2014, 6:38 am

EBOM 2009 EAp1 L-9 upload document

EBOM-2009 EAp1:Energy Efficiency Best Management Practices
posted by  James Doyle  on 

The credit template form for EBOM 2009 EAp1 on page 2 requests "Upload L-9. Provide a breakdown of total project building annual energy consumption by major end uses or applications.

1
Tue Jun 17, 2014, 1:06 pm

How to document split system units

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  Helene Lefkowitz  on 

I am working on a hotel project that has multiple split system units. This means two part numbers, one for each unit, to account for all mechanical cooling equipment.

1
Sat Jul 26, 2014, 5:42 am