Forum quick links
Cruise Terminal - Public Transportation
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Sheryl Swartzle on
Our cruise terminal is located within a secure port, county transit buses are not allowed access to the port (for security reasons) but have a stop not far outside of the security check point (but
Default Daily Occupancy - Areas to use
CS-2009 PIf3:Occupant and Usage Dataposted by Sadie Martin on
Can someone confirm if we are to only list the Regularly Occupied Spaces in the Default Daily Occupancy chart?
Lighting Power Density Using The Building Area Method
NC-2009 EAp2:Minimum Energy Performanceposted by Curtis Clark on
How do you apply Building Area Method (ASHRAE Table 9.5.1) to a higher education building that has five building area types? 1. School/University 2. Dining: Cafeteria/Fast Food 3. Office 4. Police/
Ventilation (G3.1.2.6)
NC-2009 EAp2:Minimum Energy Performanceposted by Curtis Clark on
A proposed building is designed which the minimum flow rate on the VAV box is the minimum outside air ventilation rate.
Blower door test for 1 in 7 of each room model
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Nadia Ayala on
Hi, I was wondering if the v2.2 option (HERS methodology) would still apply for v2009 in regards to the blower door test and number of units that must be tested.
Commissioning
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Karina Hanyzewski on
In a situation where the building undergoes tenant improvements before the shell construction is complete, does the commissioning work need to be adjusted to pick up the changes, even if they are t
Calculating secure bicycle spaces and showers facilities
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by MKK LEED on
Good Morning, I’m calculating the number of spaces for bicycles and showers facilities for C&S project > 300.000 sf.
Alternative-fuel fueling stations for everyone?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Jan Hesse on
We are working on a project with 350 parking spaces and several tenants. One tenant will install 11 alternative-fuel fueling stations (>3% of all parking spaces in the building).
Sewage Conveyance from the site
CI-2009 PIf2:Project Summary Detailsposted by Lakshmikanth Kousik Toppe Jeyabalan on
My project is in Singapore and it is a norm here that all the building sewage will be connected to the public utility drains and send for treatment, reclamation & disposal. I have been requeste
feedback comment
Pilot-Credits WEpc10:Sustainable wastewater managementposted by Mónika Egyed on
In our project, the pilot credit was achievable by 50% reduction from WC and urinal water use.