NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Omar Elrawy on
Dear all, We have a project where we intend to pursue Option 1 Path 1, We will install furniture after completing the flush-out, but the architect is concerned about the carpet install
VLT x WFR calculation exceeds 0.18
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Indoor Environmental Quality Team LEED Community Project on
I am reviewing Option 1 Path 2 (Prescriptive) for a visitor's center project. There are several private offices where the VLT x WFR value exceeds the 0.18 threshold.
Fundamental Commissioning vs Enhanced Commissioning
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Zeb Foss on
Hello, I am in Canada so we are sill required to use LEED CI 1.0, and I have a question regarding the responsibilities of the CxAs.
SS 7.1-4 LEED Online form issues?
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by Wendy Parker, LEED AP on
Is anyone else having issues with filling in the Non-reflective parking spaces table in this form?
Factory Space Default value
CS-2009 IEQp1:Minimum IAQ Performanceposted by John Covello on
Hello, We have a client who is designing a C&S factory. They are not sure who the tenant will be other than a factory space.
Residential grade dishwasher in breakroom
Retail-CI-v2009 WEc1:Water use reductionposted by Robin Dukelow on
The WEp1 language reads: ". . . and are not commercially rated MAY also be excluded.
Fan power calculations
CS-2009 EAp2:Minimum Energy Performanceposted by Eleni Soulti on
Hello, We have received a review from LEED saying that for the baseline model there are inconsistencies between the demand values reported in Table EAp2-5 and Table 1.4. When completing Table 1.4
NAF (GLUE) LETTER
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by jack larson on
I have a letter from the manufacturer stating that the laminating adhesive that will be used in the fabrication of the doors contains no added formaldehyde. (NAF).
Forniture in IEQc8.1 option 1
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by FABIO VIERO on
Dear all, I'm now working on a project (office building, new construction) under LEED NC v2009 Certification.
Flow Restrictors
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Malek Abualhaj on
Hello, we have non compliant faucets and showerheads, therefore, we are going to install flow restrictors. Would we need to test them at 60 and 80 psi?