EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Gabriel Frasson on
I was wondering if some packaging of products that adress IEQ requirements but also attend one or more MRc1 criteria can be used here, like soap packing. Other question is, shampoo and/or band-aid
Preliminary earthworks before project registration
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Amanda Johnson on
Hello, For complicated planning reasons on a large (probably Campus) project some preliminary earthmovement and demolition will take place soon, but the project is not yet registered.
Offsite restoration for greenfield developments
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Marni Punt on
Could anyone confirm if the case 2 addenda (11/3/2010) could be relevant to Greenfield developments as well? What would the documentation that must be submitted be?
Sandy soil
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Rustem Saitov on
Could anyone kindly clarify the following issue: I work with a project on construction of industrial plant.
fitness centre equipment
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Jutta Berns on
We are busy with a fitness centre project and looking to confirm which appliances/equipment we typically would have to include in this credit.
Table 9.4.5 basketball court
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I’m modeling a project where there is an external basketball court, which is illuminated. I’m considering Table 9.4.5 “Lighting power densities for building exteriors” for the baseline model.
Rapid bus
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by K Nakamura on
Can a rapid bus qualify as a "light rail" or "commuter rail"?
any SRI requirements for pavers and roads on site?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Sahar Abi-Ziki on
We are trying to achieve SS.c7.1, we have more then 50% of parking underground.
Bus Stops
NC-v4 LTc5:Access to quality transitposted by Florencia Guggenheim on
Hi, i would like to know in the case i have one bus stop but with different bus lines, can i count de trips from every line or just of one of them? thank you very much!
Air shaft / light well
CS-2009 IEQp1:Minimum IAQ Performanceposted by Angela Saggin on
Hi! We are studying the possibility to certificate a 20 stories residential building with 6 apartments per floor.