Regional- Additives Taken into Consideration?
CS-2009 MRc5:Regional Materialsposted by Roberto Meza on
I have a question regarding the Regional Materials Credit: If a product has the following components: - Cement (local product) - Sand (local product) - Additives (imported) Will this product comp
CS MPR2: reclaimed land without development previously
CS-2009 MPR2:Must be a complete, permanent building or spaceposted by Vivien Wong on
Dear Tristan, If a project is located in a reclaimed land which without previous development (i.e.: the project will be the first development in the reclaimed land), can still meet the requirement
IAQ Option #1
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by David Biggs on
For a building pre-occupancy flush-out what are the requirements for substantiating that the 14,000 cfm of OA was actually completed for the entire square footage.
Appealing WEp1
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Anu Sumanth on
We have a small two story core and shell project. The owner provided rough ins for plumbing fixtures to be installed by the tenant.
Bus Stops for Exemplary Performance
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Yuran Pan on
There are around 10 bus stops that are within 1/4 mile walking distance from the building main entrance (Some of the bus stops only have one bus line).
TI in a LEED certified Core & Shell Building
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Chris Hammett on
Hello. I am currently working on a tenant improvement project located within a building that was previously LEED certified under the Core & Shell rating system.
selecting controller efficiency manufacturer company
NC-2009 WEc1:Water Efficient Landscapingposted by prerana tuladhar on
how to select the controller effciency manufacturer company? which company is the best and supplies worldwide??
CxA in projects over 50000
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Felipe Martinez on
Can the CxA in a project over 50000 ft^2 be someone from the MEPFP design team? Thank you in advance.
Multiple zone vs Single zone
CI-2009 IEQp1:Minimum IAQ Performanceposted by Emmanuel Pauwels on
Hi all, we have a doubt about the system type to use for our project.
process load: water treatment plant
NC-2009 EAp2:Minimum Energy Performanceposted by Mark Palmer on
I see that several water treatment plants on the LEED registered and certified list.