Forum quick links
Can reusing a parking garage count toward this credit?
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Caleb Lesselles on
We are currently working on a multiple building mixed-use project that is reusing a 3 level parking garage.
System CRI certified
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Gabriel Frasson on
if the cleaning company says that the cleaning system is certified it would be accepted by LEED? Or only the equipments ? Because I found some companies that work with certified system, however, th
SSc 3.3 Parking Availbility
posted by Jaclyn Noga on
There is no parking space available around the building, will that be satisfied for Exemplary Performance under the Version 3 rating system?
IEQc7.1, MET and CLO, and Acceptable Alterations
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Adam Kingsbury on
I am completing documentation for a dormitory that has a Summer/Winter operative temperature of 75/70, respectively.
CASE 2 and EAP2 Cumpliance
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by João Gaio on
Hi, We are working on a multi tenant enclosed mall with aproximmatly 120.000, to be certified LEED 2009 EBOM. In Portfolio Manager, "enclosed mall" is not eligible to receive EnergyStar score.
CLO level adjustments
NC-v4 EQc5:Thermal comfortposted by Adam Kingsbury on
I am struggling to make spaces with a low metabolic rate (1.2 or below) comply with ASHRAE 55 at the current temperature setpoints (75 summer, 70 winter - air speed is 40 FPM and RH is 55%). I can
Donated Furniture
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by richard heflin on
Myself and two other students are trying to document and submit MRc3.2 for a health clinic that has roughly 90% donated used furniture.
Proprietary Ingredients
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Elizabeth Felder on
Hello, the herbicide used at one of our properties consists of 98% proprietary ingredients. If the manufacturer will not provide a breakdown, would we be disqualified for this credit?
Correct invoice structure for millwork
NC-2009 MRc7:Certified Woodposted by Susan Di Giulio on
Hi there, I have been having a heck of a time getting correct and complete millwork invoices even from FSC certified shops, who really ought to know.
Exemplary performance?
posted by Erica Downs on
The Reference Guide says "this credit is not eligible for exemplary performance...." However, the LEED Online Form (form v4) has a line item for "SS Credit 2: Development Density and Community Con