Forum quick links
Certify a Building Extension
NC-2009 PIf1:Minimum Program Requirementsposted by Anna Ohlmeier on
Hello all, we would like to certify the extension of an already LEED certified building. Do anyone know if there are other regulations or it is possible to extend the first certification?
Retail tenant in a mall
posted by Kate Bubriski on
If I am doing a retail store that is located in a large shopping mall can I use the other items in the mall to fulfill the 10 basic services?
ID point for Green Cleaning- need advice
NC-2009 IDc1:Innovation in Designposted by Tammy Dalton on
I am planning to pursue an ID point for Green Cleaning for a NC v2009 project.
IAQ Flush out-using temporary exhaust systems
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Stella Stella on
Hi, We are proposing a IAQ flush out procedure for our facility which consist of a lot of FCU’s. Due to the FCU’s the flush out procedure is excessively long.
LEED Project Boundary - Football Stadium
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Lisa VandeVoort on
Our project is a new football stadium on a college campus. Is it acceptable to limit our project boundary to include just the pressbox / suite tower?
energy costs
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Sometimes in the energy bills a part of the costs doesn't depend on the energy that is used (e.g.
No VOC information
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Citlali Mora Bello on
Hello, We are working on a project that is trying to achieve this credit, but I've encountered two problems: 1. Some of the cut sheets do not specify the VOC test methodology. 2.
Lighting Power Density
NC-2009 EAp2:Minimum Energy Performanceposted by Bernie Hont on
I am modeling a shell office building project for LEED 2009 using ASHRAE 90.1-2007 as the basis for modeling.
Required Vegetated Area and LEED Boundary Calculations
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by CT G on
Hello, We have a project with the following site constraints: The LEED Project Boundary includes 2 new buildings: an office tower, and a small bank building.
Commercial Kitchen
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Nate Gillette on
Would one consider items purchased for a commercial kitchen (i.e., new glasses, plates, creamers, etc) a durable good? It seems like the only place to put it. Thoughts?