Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Engineered ventilation system - operable windows

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Ritwik Kakati  on 

In our high-rise multifamily building project, we are trying to demonstrate IEQp1 compliance for living rooms & bedrooms by showing an engineered ventilation system whereby toilet exhaust fans

1
Tue Sep 2, 2014, 10:31 pm

Landscaping - MRc4

NC-2009 MRc4:Recycled Content
posted by  frederick muscatello  on 

Can landscape and irrigation materials be included?

1
Wed Sep 3, 2014, 2:25 am

Regarding LEED Project Boundary

EBOM-2009 MPR3:Must use a reasonable site boundary
posted by  Shelendra Kumar  on 

Hello Team, One of our project which is already LEED NC certified and now wants to go for EB certification, our concern is about its project boundary. earlier certain boundary has defined for NC

0

Functional Performance Testing

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Giulia Faccio  on 

Our project, registered under LEED 2009 Italia NC, consists in a building whose occupancy will take place in October 2014.

1
Thu Sep 4, 2014, 2:44 pm

Occupancy Doubt

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Marina Andrade  on 

Hi everyone, i'm working in a office building that will be certified.

1
Wed Sep 3, 2014, 7:32 pm

Building Includes Television Studio

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Sara Zoumbaris  on 

Hi, I am looking into a campus building that has a television recording and broadcast studio within in.

1
Wed Sep 3, 2014, 6:39 pm

Downstream Defender for 80% removal of TSS

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Bina Indelicato  on 

I am working on a project which plans to use the Downstream Defender by Hydro International to achieve 80% TSS of stormwater. The literature with the product says it treats 50% of TSS.

1
Wed Sep 3, 2014, 7:04 pm

Opt 2 metered water use and building level water metering

EBOM-v4 WEp1:Indoor water use reduction
posted by  OSCAR DE LA RED  on 

Can the water meter installed to measure the monthly and total building level water (WEPR2) be used to determine the anual Option 2 metered water use baseline (WEPR1 option2) if there is no more

0

LEED reviewer comment

CS-2009 EAp3:Fundamental Refrigerant Management
posted by  Gaston Michaud  on 

We are working on a mixed CS project that will probably include restaurants in the first floor and office space above.

1
Thu Dec 3, 2015, 12:08 am

Mechanically conditioning and natural ventilation

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Gustavo De las Heras Izquierdo  on 

Can a mechanically conditioned space be naturally ventilated? I mean, is this combination allowed by ASHRAE 62.1-2010 and ASHRAE 55-2010?

1
Fri Apr 17, 2015, 4:52 pm