Forum quick links
Parking is not a prerequisite for Option 2?
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Ricardo Sá on
The bird's eye view for this credit states that parking is not a prerequisite for Options 2 and 4.
BECx on pre-fab steel building
NC-v4 EAc1:Enhanced commissioningposted by Brett Farbstein on
Has anyone had experience with implementing BECx on a pre-fab, steel building?
Transplanting trees as a means to save them
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Sara Greenwood on
Hello, Unfortunately, the trees on this site will need to be removed for the building but the owner would like to donate the trees to a nursery rather than a woodchip mill.
Energy Efficiency for industrial plants
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Diego Pietzsch on
I do have a industrial plant trying to certify under LEED EBOM.
Occupancy Count
CS-2009 WEp1:Water Use Reductionposted by PAWAN DAHIWAL on
Hello everyone, Can we consider default occupancy count from ASHRAE 62.1 for water calculations rather than LEED CS guide?
LPD Calculation Technical/Plant/Maintenance Rooms
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Ian McCall on
Dear all, Are technical, plant, maintenance, goods stockage rooms included in this LPD (Lighting Power Density) calculation? Are staff stairwells included? Thank-you Ian
And/Or Inside the Building
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Omar Elrawy on
Dear all, My first question is that which part exactly from the Reference guide states that the entryway system should be placed inside the building?
Conference Rooms with folding partitions
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Christine Spendiff on
I have a large conference room with a folding partition to create two smaller conference rooms. Do I run the simulation with the partition open (one large room) or closed (two small rooms)?
Analysis areas for large building
NC-v4 EQc7:Daylightposted by Jody Lee Potvin-Jones on
Hi, For EQc7: Daylight.
On-site, third party owned solar
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Nicholas Bristow on
Our project has an on-site, third party owned Solar PV system.