Forum quick links
Software model energy
CS-2009 EAp2:Minimum Energy Performanceposted by gabriel Morales on
Hellow We are developing an energy model for CS 2009 building and we have been offered a sfoftware SEFAIRA and we want to know if it is approved by the GBCI, to document and EAC3 EAp2.
Using VAV box CFMs as measurement of outside airfow
EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoringposted by Sean Blaevoet on
Will GBCI accept monitoring of VAV box CFMs as measurement of outside airflow during "economizer" mode?
Requirements for Copy/Printer Rooms
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Sean Blaevoet on
Does LEED require the copy/printers to be in a separate room with doors?
Classification of handsinks
CS-2009 WEc1:Water Efficient Landscapingposted by Sean Blaevoet on
How are "handsinks" classified? Is it lavatory? Is it kitchen sink? Or is it exempt? Or other?
Lighting Building Area method
CS-2009 EAp2:Minimum Energy Performanceposted by Pia Öhrling on
If the building is an office building with a small part retail and restaurant how should the areas be calculated for lighting when using the Building Area method?? The space usage types listed in P
Baseline System configuration for mixed use condominium
NC-2009 EAp2:Minimum Energy Performanceposted by Jason Biondi on
We are working on a 10 story mixed use building consisting of approx.
SS CR 1 - Site Selection
CI-2009 SSc1:Site Selectionposted by Harsharan Kaur on
Hi, We are planning to get our facility certified under LEED CI (USGBC) Ver. 3.0.
CMU as regional materials
Homes-v2008 MRc2:Environmentally preferable productsposted by Benjie Herrera on
Can we achieve .5 pt. of Environmentally preferable product credit if we will be using CMU in the fence/landscaping area/grass area? Is this area considered as exterior wall? Pls. Advise.
Occupancy sensors: No override switch but with task lighting
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by André Harms on
Hi, There are several spaces in a project I'm working on that have been designed with an occupancy sensor without an override switch but each individual work station does have controllable (on/off
ASHRAE Standard
CS-2009 IEQp1:Minimum IAQ Performanceposted by ilkyaz ceren güçlü on
Hello, We are carrying out LEED certification of an office building.