Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Bird Collision Deterrence Monitoring Plan

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Ivan Romero  on 

Our intention is to pursue Bird Collision Deterrence under NC. Several questions: 1.

0

Non certified factory with new process area aiming certification

CI-2009 PIf1:Minimum Program Requirements
posted by  Valentin Grimaud  on 

Dear community, We have had a recent enquiry from a client. He has an existing industrial site, which is non certified. He wants to relocate another industrial activity in this site.

0

fixture family

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  jorge calderon  on 

If we are using an exposed WC Flush Valve, which fixture family and fixture type should we choose in table WEp1-3?

1
Thu Dec 4, 2014, 3:27 pm

recycling of existing floors or installation waste

EBOM-v4 MRc5:Solid waste management - facility maintenance and renovations
posted by  Diane Martel  on 

I tried to find language and have not found any. what are the parameters on waste management?

1
Wed Mar 25, 2015, 5:20 pm

Rail Station Proximity - On Demand Shuttle

Healthcare-v2009 SSc4.1:Alternative transportation - public transportation access
posted by  Crina Bosch   on 

I remember hearing discussion at a Greenbuild Session that mentioned changing the restriction from 1/8 mile. Does anyone else know if this is true?

1
Thu Dec 4, 2014, 8:34 pm

Temporary Irrigation but Reused Water

NC-2009 WEc1:Water Efficient Landscaping
posted by  Katherine Ann Resurreccion  on 

Has anyone secured a point under WEc1 without using either drip or sprinkler irrigation system?

1
Wed Oct 21, 2015, 3:06 pm

2-seat Reception Area in Middle School

Schools-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Sara Zoumbaris  on 

Hi all, I feel like I am second guessing myself with this one. I have a middle school with individual work stations including mostly private offices and one reception area that has 2-seats.

1
Fri Dec 5, 2014, 4:01 pm

Title 24 Equivalency?

NC-v4 EAp2:Minimum energy performance
posted by  Renee Azerbegi  on 

Has USGBC issued any equivalency for Title 24 (vs ASHRAE 90.1) in LEEDv4 EA credits yet? I've seen comments saying it can take a while. Just wondering if it is on the horizon for LEEDv4 or not?

1
Mon Dec 8, 2014, 4:00 pm

more information

Pilot-Credits EApc65:Monitoring based commissioning
posted by  Gail Napell  on 

Hi all - has anyone used this pilot credit? is it still open for registration? how many points are possible? IMWTK (Inquiring Minds Wish To Know) - thank you!

1
Sun Dec 7, 2014, 10:50 pm

EBOM Project Occupancy Doubt

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Marina Andrade  on 

Hi everyone, I’m working on a project and I have a doubt about occupancy in the EBOM. After the measurements, we found that the air conditioning system does not meet the external ventilation lev

1
Mon Dec 8, 2014, 2:56 pm