Forum quick links
Can a LEED NC certified building pursue now a LEED EBOM?
EBOM-v4 MPR2:Must use reasonable LEED boundariesposted by Veronica Reed on
Hello, our project, an airport terminal, got LEED Gold certified this month under version 2.2. The owner now wants to explore certifying the building for operations and maintenance under V4.
Is the daily average transients a calculation or estimation?
NC-2009 PIf3:Occupant and Usage Dataposted by Meghan Ward on
We are currently working on a office block and have managed to obtain a peak transient amount from the client of 60 transients.
Regional Priority credits worldwide
NC-v4 RPc1:Regional priorityposted by Pooja Sannamni on
For LEED V4 NC: Are regional priority credits available for any location around the world?
Reclaimed water VS Recycled water
NC-v4 WEc2:Indoor water use reductionposted by Pooja Sannamni on
Is there a difference between reclaimed water and recycled water? If so how?
Electric Resistance Heating
CS-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
What are the mandatory provisions for fan coils whose coils are heated through electrical resistances? I think par. 6.4.3.3.1 for the control. Something else?
Ductwork cleaning
CI-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Megan Bove on
Hi. If when inspecting a LEED job-site and you find that ductwork is without covering/blue film, I know that cleaning out the dust must occur.
Who can be CxA?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Allan Vásquez on
Hi, I’m looking for some help with the Commissioning Authority experience.
Shuttle
EBOM-v4 LTc1:Alternative transportationposted by LEED Pro Consultant on
Are we able to use a shuttle run by building owner as an alternative transportation strategy? Thank you!
Fenestration U-value: Framed versus Center-of-Glass
NC-2009 EAc1:Optimize Energy Performanceposted by Paul Cimaglia on
I received a review comment requesting confirmation that my modeled fenestration U-value accounts for framing. I'm having a difficult time contacting the window manufacturer.
caulk
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by cathy keagle on
Which category is siliconized acrylic latex caulk under