Third Party Review v4?
NC-v4 EAp2:Minimum energy performanceposted by SBS Department on
Does anyone know if either prereq EA - Minimum Energy Performance, or the Optimize Energy Performance credit need a third party review as it did under the CaGBC's LEED 2009?
Cnstrctn began with no LEED intent nw thy wnt rsume seeking LEED
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Aly Adel on
Hello! We have a project that started construction some time ago, and stopped 1 yr ago, leaving only phase 1 (concrete slabs only).
educational strategy
NC-2009 IDc1:Innovation in Designposted by jorge calderon on
Hi, we have a project that is an museum and auditorium with many educational components, as tour, video, activities, interactive web page, etc. Is it possible to obtain two ID credits for educatio
plant nursery
NC-2009 IDc1:Innovation in Designposted by jorge calderon on
Hi, I think this interesting innovative idea may give us an ID point. From pruning the green roof we have created a plant nursery where we have new plants that give away our visitors.
Reused area of column and beam
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Zhantong Chen on
In MR c1.1, how to calculate the column and beam area?
no new parking, but how to use local zoning for off-site park?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Courtney Royal on
there will be no new parking in our LEED boundary, but we'll be allocating a few spots in the neighboring parking lot for the use of our building.
treat rainwater?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Courtney Royal on
area you required to treat harvested rainwater when using to flush toilets? if yes, what does "treated" mean exactly, what level of treated would be required? Thanks!
MODEL PROTOCOL
NC-2009 EAp2:Minimum Energy Performanceposted by RICARDO GUEMEZ on
Hello, My name is Ricardo from Mexico City.
VAV boxes
CS-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
We request for a clarification regarding mandating the tenant to use the VAV boxes in core and shell projects. In a core and shell project, we will not know what system the tenant will be using.
Master site credits
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by charles bell on
We have three projects on a campus application. The master site submittal for this credit as well as others was approved during review.