Forum quick links
Minimum exhaust Rates
CS-2009 IEQp1:Minimum IAQ Performanceposted by Elodie DUMAS on
Dear all, We work on a private office building where toilet facilities are composed of several individual toilet rooms. Reading the ASHRAE 62.1, we are not sure about the occupancy category of thes
ASHREA audit though newly renovated
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Mathilda Jonsson on
Hello Five years ago my project building were LEED EB:OM certified and now with new tenants and a renovation taken place we are recertifying.
Relocation of existing trees within site
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Yiwei Koh on
Hi, A project I am working on has some existing mature trees, there are intention to relocate the trees within the site. In this case, how can i account this under SSc5.1?
LEED documents
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Olga Kim on
Good afternoon all, I have a question about LEED certification. We produce high quality water basied paints in Kazakhstan. Our products are certificated by Kazakh Certification Center.
M&V Plan
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Akshay Odugoudar on
Does the M&V Plan for EAc5.2 have to include what tool is being used to calculate the baseline energy use of the building?
PPM versus other units of measurement
Pilot-Credits EApc66:Community contaminant prevention - airborne releasesposted by Jennifer Berg on
The current credit uses ppm units for all equipment. This is not a common measurement used or documented for generators.
Structurally Independent Garage - which credits to consider?
Healthcare-v2009 SSc7.1:Heat island effect - nonroofposted by Iris Amdur on
Hello, Firstly, Tristan or Susan, if you guys think that I would be better served putting this comment under another credit, please let me know..
Volume Captured on the Stormwater Mgmt Calculator
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Kimberlee Dobbins on
Going from LEED-EB 2.0 SS credit 5.1 to LEED 2009, O&M, what is the number for "Volume Captured"?
Leased off-street parking spaces
NC-v4 LTc7:Reduced parking footprintposted by Alicia Villanueva on
Hi! We are working on a project that does not provide any off-street parking on site but parking spaces for employees are leased from 3 nearby parking garages.
Supplemental Guidance to the MPR for LEED v4
NC-v4 MPR1:Must be in a permanent location on existing landposted by SoYoung Lee on
It seems to me that the MPR guidance for LEED v4 does not sufficient to comprehend the project specific features.