Forum quick links
Innovation In Design Credits
NC-2009 IDc1:Innovation in Designposted by Brian Harris on
After a design or construction submittal review, if one (or more) of the ID credits is not accepted, may it be replaced with a different ID attempt on the re-submittal? Myles Huddart LEED AP BD+C
Thermostats with humidity and CO2
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Kristopher Lashley on
Hello all and a happy new year, I am wondering if anyone knows of a thermostat that can also measure and display humidity and CO2 levels? We are trying to find a way to cut down on the number of s
Air Economizer Requirement
NC-2009 EAp2:Minimum Energy Performanceposted by Rock Ridolfi on
The owner would like to eliminate economizers on a few of the air handlers.
Question about cut sheets
NC-2009 MRc4:Recycled Contentposted by Magda Aghababyan on
My project uses lot of steel and that is a very large portion of the total material budget. The supplier has not provided cut sheets to confirm the recycled content of steel.
Exterior Lighting not yet designed
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear All, I am modeling a project which still has no exterior lighting design (the owner will decide on this when the building is almost complete). In the preliminary design review, I put the val
CSRs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by NESLIHAN AKSOY on
These reports are very wide range ...but the credit is dealing with sources of raw material extraction.....?
Non-Smoking Policy
CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Erika Duran on
Dear All, I have a hotel project that has a non smoking policy for the entire hotel.
Mixed-mode ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Lise Dannesboe on
Dear all! How do you show compliance with case 1 for GBCI, mixed-mode ventilation?
HET Retrofit
NC-2009 WEc3:Water Use Reductionposted by Matthew Catterall on
I've noticed that dual-flush flushometer retrofit kits are mentioned as a way to earn this credit on existing commercial toilets (rather than replace the entire toilet); however, there is no mentio
Residents excluded?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Miranda Lescaze on
A portion of our building is office space and a portion is multi-family senior residences.