Forum quick links
IAQ-Flushing (Door & Window Open)
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Girish Visvanathan on
Hi all,
is it acceptable to perform flush-out with door and windows open for a period of time, rather than using mechanical equipment's (exhaust/ HVAC system)?
LEED ACP for District Energy (PEER) for ID+C?
CI-v4 EAp2:Minimum energy performanceposted by Brian Salazar on
Hello! We are working on a stand-alone building interior, located within a university campus.
Distribution of spaces and occupancy definition in a Core and Shell project
CS-v4 EQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
Dear All,
I have a question regarding LEED v4 BD+C Core and Shell, EQ P1 Minimum Indoor Air Quality Performance and EQ C1 Enhanced Indoor Air Quality Strategies.
Occupant's survey
Pilot-Credits INpc136:Safety First: Re-Enter Your Workspaceposted by Dulce Solis on
My team would like to know if you would consider taking an approach in the occupant's survey where we keep track of their current health state.
VOC Compliance for Toilet pods manufactured offsite
NC-v4 EQc2:Low emitting materialsposted by Alokmay Behera on
There is a mixed-type building targeting LEED Platinum based in UAE. The project will have all toilet pods constructed offsite.
EAP2 - air tightness test
NC-v4.1 EAp2:Minimum Energy Performanceposted by Hafsa BOUCHFER on
Hello,
the enhanced commissioning credit - the air tightness test
CI-v4 EAc1:Enhanced commissioningposted by Hafsa BOUCHFER on
Hello,
Moving a House for reuse?
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Laura Soma on
Hi All - working on a project that has 3 older houses on the property. 2 of them will be moved to a new location and put back into use as residences (the 3rd isn't in good enough shape t