Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Acoustic Test in the Field

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  Holly Van Straten  on 

I am a manufacturer of HVAC equipment that is installed in a classroom. Due to this prerequisite I get frequently asked if we "meet LEED standards".

1
Tue Apr 28, 2015, 9:54 pm

EAP2 case 1 for international projects

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Elodie DUMAS  on 

I have a question about the following statement from above : "We have an international project and the space type is eligible for an Energy Star rating.

1
Tue Apr 28, 2015, 6:59 pm

Better to include PV in the ASHRAE model or calc outside?

NC-2009 EAp2:Minimum Energy Performance
posted by  Carol Roberts  on 

We are working on an ASHRAE 90.1 model in Nevada and are adding the solar information manually to the LEED online forms, post energy modeling (so our solar energy is not appearing on the software g

1
Wed Apr 29, 2015, 1:59 pm

Window to Wall ratio uniform?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

I recently noticed LEED Reference Guide for EAc1 Example Option 1 (p278) says we need to redistribute the window to wall ratio uniformally on each orientation of the building.

1
Wed Apr 29, 2015, 4:10 pm

Soil used as filling material can count for MRc5?

CS-2009 MRc5:Regional Materials
posted by  Alicia Villanueva  on 

Does the soil used as filling material for the construction can count for MRc5? It is permanently installed in the building, and the Reference Guide doesn´t mention it as in MRc2 where excavated so

0

Planned City Bus Stop and Shuttle?

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Cynthia Estrada  on 

I've seen a few postings but no solid information on whether or not GBCI will accept verified plans for either a shuttle bus and/or a planned additional bus stop to an existing route.

1
Wed Apr 29, 2015, 7:33 pm

Equipment Baseline

Pilot-Credits EApc3:Medical and process equipment efficiency
posted by  LUCY WILLIAMS  on 

Our team is considering pursuing this credit, but it is unclear what baseline the specified equipment is to be measured against.

1
Mon Mar 15, 2021, 10:04 pm

Non occupied spaces

NC-v4 EQc2:Low emitting materials
posted by  Caroline PIN  on 

Hello, Is nonoccupied spaces are affected by this credit ?

1
Thu Apr 30, 2015, 12:46 pm

RECs for Europe

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Charalampos Giannikopoulos  on 

Could you advise of a list of REC vendors who could provide offsite renewable energy for a project located in Europe (Greece)?

1
Tue Dec 1, 2015, 10:04 pm

Testing of units with the same layout

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Ilana Judah  on 

We are working on a large high-end high-rise residential project with a variety of unit sizes and layouts.

1
Fri Nov 27, 2015, 7:58 pm