1 year contract?

NC-2009 EAc6:Green power
posted by  Erin Holdenried  on 

In v2.2 is was acceptable to have a 1 yr contract as long as the total green power purchased was equivalent to 2 years of 35% electricity, or year of 70% electricity for exemplary performance.

1
Fri May 29, 2015, 6:34 pm

Bamboo and CS

CS-2009 MRc6:Certified Wood
posted by  Rosario Lidia Maguey Peña  on 

Hi! Is bamboo included in credit MRc6 for Core and Shell? We have a Core and Shell project in which the client wants an specific wood finish for the ceiling in the Lobby.

1
Tue Jun 2, 2015, 1:58 pm

Land disturbed vs. land supporting normal building operation

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Michelle Bombeck  on 

This question has been asked many times and I'm wondering if anyone has some more recent experience with a submittal.

1
Thu Jul 9, 2015, 7:45 pm

62MZCalc Excel Program

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gordon Nielson  on 

which is the correct abbreviation for a single duct constant volume system with fresh air introduced at the fan?

1
Mon Jul 6, 2015, 10:28 pm

62MZCalc

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gordon Nielson  on 

I noticed, I cannot enter rooms that require exhaust like restrooms and lockers. Do I exclude them on the excel spread sheet?

1
Mon Jul 6, 2015, 10:21 pm

Calculating Daily Average for Transient Users

NC-2009 PIf3:Occupant and Usage Data
posted by  Randy Weatherly  on 

Based on the examples presented on this site, the daily average is based on 365 days a year. Is this correct or should it be based on actual days the facility is open for business? Thanks

1
Tue Dec 15, 2015, 9:21 pm

Wedding Hall with Dance space Design for Credit 7.1 & 7.2

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Lew Bonadies  on 

We wish to pursue the credits IEQ 7.1 & 7.2 , the space is auditorium seating with a dance floor for Wedding .(Area - 5300 sq ft , Occupancy 370 People), having office spaces on other floors .

0

EQc5 - Parking Garages

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Kristopher Lashley  on 

We have a multi story underground parking structure that is exhausted with 26,000cfm P1, 32,000 cfm for P2 and P3.

0

Emergency generator fule meter

CI-2009 EAc3:Measurement and Verification
posted by  Edwin Wealend  on 

Hi we have a LEED CI project that is served by an emergency back-up generator that serves multiple floors. Is it really a requirement to meter emergency back-up generator fuel?

1
Tue Jun 2, 2015, 2:06 pm

measuring heat pump load for system submetering

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  ethan adams  on 

I have about 35 ceiling- mounted heat pumps throughout the building, and it would be cost-prohibitive to install a separate meter on each one.

1