CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Akos Brandecker  on 

Many of our clients are installing 'workspace pods' in their offices to encourage flexible working. These pods come in many shapes and sizes for individual/ group working, meeting spaces.

1
Mon Jan 11, 2016, 10:54 pm

Performance Period

EBOM-v4 WEp2:Building-level water metering
posted by  Matthew Hanks  on 

I was hoping to get some clarification about the question that was asked below. What is the performance period for this credit?

1
Tue Jun 23, 2015, 12:56 pm

Doubt

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Hugo Pereira  on 

Hello there. My team and I are certifying a building in Brazilia, Brazil.

1
Wed Jun 24, 2015, 7:35 pm

indoor smoking room exhaust

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Nicole Isk  on 

Hi, an occupant in our project building (office) insists on indoor smoking. He agreed to installing a cabin in his kitchenette (they already smoke there).

1
Tue Jul 7, 2015, 10:02 pm

Retail (other than mall) or Enclosed Mall

Retail-CI-v2009 EAc5:On-site renewable energy
posted by  Geraldine Assmus  on 

I'm certifying a project which is located within a mall, it has access from the street and from inside the mall.

1
Sat Apr 9, 2016, 10:04 pm

Submission through design review

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Charalampos Giannikopoulos  on 

Does the tenant design & construction guidelines (which is considered as a design credit) need to be finalized for review submission?

1
Mon Nov 30, 2015, 5:19 pm

Option 2 IAQ Testing - Schedule

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Anne-Claire BARBERI  on 

Hello, In the reference guide, it is written that for "Option 2 Air Testing", the test must be conducted after construction ends and within 14 days following occupancy.

1
Fri Jun 24, 2016, 9:52 am

Contact at USGBC regarding LEED ND

ND-Plan-v4 MPR3:Must comply with project size requirements
posted by  Martine Desbois  on 

I am looking for a contact at USGBC to discuss our project. Would it be possible to have a contact person name and email or phone number?

1
Fri Jun 26, 2015, 3:30 pm

Protect Habitat on Campus

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Marissa Hebert  on 

Our project is a large medical campus with multiple buildings on a greenfield site.

1
Thu Jul 2, 2015, 7:04 pm

How to calculate Floor Area to be Ventilated?

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Vitor Tosetto   on 

Dear, I have one more question, please. In ASHRAE 62.1-2010 section 6.4.1 there is an explantion about floor area to be ventilated.

1
Thu Dec 15, 2016, 9:47 pm