Residents and Visitors

NC-2009 WEc3:Water Use Reduction
posted by  Saju Varghese  on 

I'm working on a rehab facility that has private toilets for residents (patients) and public toilets and urinals for both visitors and residents (patients).

0

Differential pressure with large open basment parking garage

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Meghan Ward  on 

Our LEED project building has a large three floor basement parking (74900 ft2) with small enclosed lobbies (with self-closing doors) connecting occupants to the office floors above.

0

Previously Developed Prime Farmland

NC-2009 SSc1:Site Selection
posted by  Haley Duncan  on 

Hi, I saw a previous post and response that suggested submitting a CIR or LEED Interpretation for projects that are building on previously developed sites that are considered prime farmland.

1
Fri Nov 27, 2015, 6:24 pm

Double trouble with ceilings

Schools-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Cynthia Kaplan  on 

Our school project is retaining nearly all of the original plaster ceilings. We are, however, removing the suspended ceilings that were installed in the 1970's, just below the plaster ceilings.

1
Wed Nov 25, 2015, 2:40 am

"physical impediments" "valid for remodeled buildings" ???

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Peg Manuel  on 

Two projects, we've received the following comment: "Note that LEED Interpretation 10098 allows for a portion of the entryway system to be located outside of the building, if covered, but only when

1
Fri Jul 24, 2015, 1:29 am

Green roof

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Alicja Bieszyńska  on 

If my green roof is covered half with vegetation and half with wood, can it contribute to the open space area?

1
Fri Nov 27, 2015, 4:20 am

ESC plan for major renovation of data center

NC-v4 SSp1:Construction activity pollution prevention
posted by  sean wang  on 

We met a confused case. As it is a major renovation for data center, there is no need for controlling soil erosion, waterway sedimentation for construction.

1
Tue Feb 9, 2016, 5:33 pm

ESC plan for major renovation of data center

NC-v4 SSp1:Construction activity pollution prevention
posted by  sean wang  on 

Here is a major renovation project for data center. Only structure reinforcement is required for major renovation.

1
Fri Jul 31, 2015, 7:07 pm

Low System Ventilation Efffiency for Corridors

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Todd Tewksbury  on 

Hi, I am conducting a ventilation calculation for the an office building that consists of open office space, conference rooms, corridors, etc.

1
Mon Jul 27, 2015, 1:16 pm

Community Connectivity - Pedestrian Access

CS-2009 SSc2:Development Density and Community Connectivity
posted by  Rachel O'Connor  on 

I'm creating the map for Option 2 - Community Connectivity. There are no major highways within the 1/2 mile radius and all of the services are accessible via sidewalk.

1
Fri Aug 7, 2015, 6:52 pm