Forum quick links
Common Area Spaces/Tenant Fit Out
CS-2009 EAc1:Optimize Energy Performanceposted by Heather South on
I am working on a Core & Shell LEED 2009 project and am wondering if for the energy simulation model on the proposed building versus the baseline, should we only include the shared common space
1 Bus Line Vs. 2
CS-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Heather South on
This credit calls for a minimum of 2 bus lines to have one or more stops within a 1/4 mile walking distance of the project.
Using Options 1 & 2 ID Point?
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Heather South on
Would it be possible to get an ID point for doing both options 1 & 2? Preferred Parking for 5% of building occupants and charging stations?
Canopy to building with wall opening (is it a "complete bldg")?
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Lee on
We have a project that is an existing canopy converted into a building without a 15' wide wall on one side. There will be a 10'x15' enclosed office inside this building.
flush out possible by phase
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Sahar Abi-Ziki on
Hello the first phase (parking garage) of our project will be delivered to client for occupancy now, but the rest of the project will still be under construction for a while.
43" partitions block views and negate compliance?
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Vanessa Seibert on
I see that there was some conversation on the views credit back in 2011.
1 VAV 2 offices, one restroom
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
Hello. I have a question regarding the controllability of thermal comfort for 2 offices.
Sub-merters
EBOM-v4 EAp2:Minimum energy performanceposted by Ann-Judith Belanger on
Hi, we have a building that share some mechanical equipment with the adjacent building.
treat wastewater to teriary standards?
NC-2009 WEc3:Water Use Reductionposted by Erin Holdenried on
I have a project that is pursuing WEc2 via Option 2 treating wastewater to tertiary standards and infiltrating onsite through landscape irrigation. Can this factor into water saving for WEc3??
Recording the recycling of "whitegoods"
NC-2009 MRc2:Construction Waste Managementposted by Neumann Monson on
In an effort to achieve a 95% diversion rate, my team will be submitting waste receipts for the demolition of two buildings that existed on our site before construction of the new project began.