Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Inherently non emitting sources

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Subhashkumar A  on 
The project consists of ceramic tile flooring and precast concrete ceiling panels in some areas. According to LEED standards, these products are inherently non-emitting sources.
2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Tue Sep 19, 2023, 5:14 pm

Offsite renewable energy production

NC-v4.1 EAc5:Renewable Energy
posted by  Subhashkumar A  on 
The project is planning to achieve renewable energy credits through offsite solar and wind power generation.
1
Tue Sep 19, 2023, 5:24 pm
8
Mon Sep 18, 2023, 6:25 pm

Baseline Projects with Several Physically Distinct Structures

Hospitality-NC-v4 EAp2:Minimum energy performance
posted by  MICHAIL MENTZOS  on 

We are currently working on a project which has a total area of about 4,000m2. The project consist of several buildings, each of them

1
Fri Sep 22, 2023, 3:29 pm

Baseline for Projects with Several Physically Distinct Structures

Hospitality-NC-v4 EAp2:Minimum energy performance
posted by  Mike Mentzos  on 

We are currently working on a project which has a total area of about 4,000m2. The project consist of several buildings, each of them is no more than 2,300 m2

1
Fri Sep 22, 2023, 3:29 pm

Air Economizer laboratory

NC-v4 EAp2:Minimum energy performance
posted by  Abdulrahman Alshbeeb  on 

We have a laboratory with very high indoor air requirements. Due to the high demands on the quality of the room air, no air may be circulated.

1
Fri Sep 29, 2023, 2:12 pm

Do staff lounges, waiting rooms, family rooms and religious spaces count?

Healthcare-v4 SSc7:Places of respite
posted by  Kendall Claus  on 

Hello!

What types of interior conditioned spaces qualify for this credit? Do staff lounges, waiting rooms, family rooms and/or chapel/religious spaces count?

Thanks!

1
Thu Oct 5, 2023, 8:48 pm

LEED CI parking

CI-v4 LTc5:Reduced parking footprint
posted by  Donna Juselis  on 

Our project is a remodel of the 2nd floor of a 3 story office building (CI v4).

2
Fri Sep 15, 2023, 5:28 pm