Which buildings/structures to consider while registering project

EBOM-v4.1 MPR2:Must use reasonable LEED boundaries
posted by  Wafa Arif  on 

I have three office towers on one large property, each connected to a mall via walkways. The shared parking structures beneath these towers serve tenants, mall visitors, and others.

0

Basement carpark areas?

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Scott McMillan  on 

As noted above the requirement is applicable to "All adhesives and sealants used onsite within the weather barrier".

5
Mon Sep 11, 2023, 7:00 am

Want to consider 30% fresh air in printing areas

CI-v4 EQp1:Minimum indoor air quality performance
posted by  Nagaraj Sankar  on 
Hi users, One of office project having printing spaces in open office. It is in the name of repro. As per LEED Requirement, whether this space should be negatively pressurised or not.
1
Wed Sep 13, 2023, 4:53 am
2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Sat Sep 9, 2023, 6:55 pm

Waste-to-Energy diversion

NC-v4.1 MRp2:Construction and Demolition Waste Management
posted by  Danielle Waters  on 

In LEED v4, waste-to-energy was addressed, but for LEED v4.1 it is not clearly stated.

1
Thu Sep 7, 2023, 6:17 pm

TABLE 1. Default Occupancy Numbers

CS-v4 EQp1:Minimum indoor air quality performance
posted by  Oscar Martinez  on 

Hi, I'm working on a warehouse project in Mexico. The rating system is v4 CS and I have a question in progress.

0

Advanced metering for cooling and ventilation

NC-v4 EAc3:Advanced energy metering
posted by  Dina El-Sady  on 

How can we separate metering for cooling an ventilation if they are both within the same unit ?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Sep 6, 2023, 1:17 pm

Menstrual product dispensors

Pilot-Credits WEpc147:All-Gender Restrooms
posted by  Emily Smith  on 

The biggest hurdle we faced integrating this credit into our project was the requirement regarding providing free menstrual products.

0

Rainwater Management

NC-v4 SSc4:Rainwater management
posted by  Ribert Senzoga  on 

I am evaluating the Rainwater Management of a warehouse project where the water table is very high and we don't have enough depth to make a water basin.

0