Baseline existing building envelopes
NC-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hi, We are currently working on an existing building under major renovation, pursing a LEED certification following NC protocol v.2009.
EA Prerequisite Minimum Energy Performance
EBOM-v4 EAp2:Minimum energy performanceposted by Jordan Kirrane on
I'm currently completing the form for the above prerequisite to achieve the credit for EA Credit Optimize Energy Performance under Case 2, Option 2.
IEQc4 - Schools v2009- Alternative Compliance from CA to SCAQMD
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Z Smith on
We are working on a LEED Schools v2009 project.
Asbestos Abatement Requirement Compliance
NC-2009 SSc3:Brownfield Redevelopmentposted by UO Design and Construction on
We always conduct asbestos surveys (assessments) in accordance with the LRAPA regulations Title 43.
Shower in Units of gpc or USgpm in Form WEp1
CS-2009 WEp1:Water Use Reductionposted by Panagiota Dadinou on
Hello, a question concerning WEp1 Could I use the flow rate in Units of gallons per cycle (gpc) instead of USgallons per minute (USgpm) for the Shower as Fixture Family in Table WEp1-4.Flow Fixt
Exchange Office
NC-2009 SSc2:Development Density and Community Connectivityposted by Gustavo De las Heras Izquierdo on
Does anyone have experience documenting an exchange office as a bank for the purposes of this credit? Thanks in advance!
VRP Compliance Calculator or 62MZCalc for projects outside U.S.?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Geraldo Pithon on
I am submitting for review a project outside the US, in Brazil. The legislation of Brazil is very similar to that specified by ASHRAE 62.1.
Zero lot project
Pilot-Credits PC14:Walkable Streetsposted by Belén Valladares López on
We are working in a zero lot line project. It's possible to consider this credit as there is no interior siewalks? Thanks
Waste offsite
NC-2009 MRc2:Construction Waste Managementposted by ethen mcmanus on
This credit focuses on how much waste material leaving the site is diverted from LANFILL.
How to Apply Research Park Guidelines when Zoning is silent
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Maggie Hogan Skaug on
A project pursuing LEED CS 2009 is located in a research park and is subject to the research park's design guidelines. Per city zoning, there is no requirement for open space.