minimum area requirement for energy modelling
NC-2009 EAp2:Minimum Energy Performanceposted by VEL MUTHU on
do we have any area requirement for energy modeling i.e. Minimum area to opt for Option 1 Whole building energy modeling aproach for EAP2?
Integrative Pilot Credit - Design or Construction Credit
Pilot-Credits PC60:Integrative Processposted by Devki Wright on
Hi there - when submitting the documentation for this credit, is this considered a design or construction credit?
Bus service in opposite directions
Healthcare-v4 LTc5:Access to quality transitposted by Bryan Finnegan on
The credit requires "Qualifying transit routes must have paired route service (service in opposite directions)" We have two transit routes that run within the required distance of an entry, but th
District Central plant heating only
NC-2009 EAp2:Minimum Energy Performanceposted by Vipul Babriya on
I have a project with district steam from central plant for space heating only. The space cooling is provided by onsite using RTUs with Dx coil.
Glass Canopy over new concrete
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Haley Duncan on
Hello, I have a similar question to the post labeled " Glass Canopy over Compliant Hardscape." We have a glass canopy over new concrete. Can I count this area as compliant?
Required parking lots and LEED boundary Calculations
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by kerry wang on
Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking s
School Building
NC-2009 EAp2:Minimum Energy Performanceposted by SSN Energy Model on
Hi, We are doing the Energy Model for SCHOOL Building. The client has proposed Air cooled chiller.
open grid paving and gravel
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Erin Holdenried on
What qualifies as "open grid paving"? Can a gravel bed designed to be 50% pervious qualify as "open grid paving"? Thanks
Required parking lots and LEED boundary Calculations
CS-2009 MPR3:Must use a reasonable site boundaryposted by kerry wang on
Hi all, We have a question about LEED boundary calculation as below: In order to save the land, our company has set up a shared parking lot in the area, so this project does not have new parking
Multistorey car park
ND-Plan-v4 GIBc10:Solar orientationposted by Elena Verani on
We have a block including three buildings: 2 office buildings and a multistorey car park.