SMOKING SIGNAGE for EAp: Environmental Tobacco Smoke Control
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Ramon Christopher Medrano on
With regards to our LEED v4 O+M project (group approach).
Hybrid recooler
NC-v4 WEc3:Cooling tower water useposted by Florian Schmidtchen on
Dear all, Our MEP Engineer wants to implement a dual recooling system/the hybrid recooler of the series KAVH.
NC Building with no cooling tower
Pilot-Credits WEpc94:No Cooling Towerposted by Paula Hernandez on
Hi, I think that this is a very helpfull credit for all the buildings that does not have a cooling tower in their HVAC systems.
CO2 Monitor Option
NC-v4.1 EQc1:Enhanced Indoor Air Quality Strategiesposted by Beth Brownlie on
We are located in CA and many of our projects have airside economizers.
CO2 Monitor without Densely Occupied Spaces
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Jesse Hunt on
Does anyone know if you can achieve a point for CO2 monitors without any densely occupied spaces?
Indoor Water Use Reduction - Occupancy clarification
NC-v4 WEp2:Indoor water use reductionposted by Subhashkumar A on
The project building is a gym building (G+2). On the second floor, it has residential units for its employees. The employees who work in this gym building stay in these residential units.
Integrative Process v4.1 - Project Team Letter
NC-v4.1 IPc1:Integrative Processposted by Kelli Kimura on
Hello,
In what case we don't have to run a baseline model with all 4 rotation
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi , I am working on a LEED Data center model with majority of space as vault, now I know for an existing building we dont need to rotate but for a data center do we need to rotate as the majority
100% of waste or most of waste?
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Allison Smith on
Has anyone had sucess achiving this credit by using an RCI facility for the majority of the waste and then using another facility for the demolition waste?
Default EIA rates for India
NC-v4 EAp2:Minimum energy performanceposted by Moses Chong on
Hi! I'm working on a project in India. We cant obtain the utilities rates so we were trying to use the deafault EIA rates like other projects we did in the US.