Forum quick links
Lighting power allowance calculations for V4 ID+C Retail
Retail-CI-v4 EAp2:Minimum energy performanceposted by Joanna Peacock on
According to ASHRAE 90.1-2010, paragraph 9.6.2, an additional interior lighting power is allowed for the following categories: a) Decorative lighting (up to 1W/ft2) b) Merchandise lighting c) For
Final Report
NC-v4 EAc1:Enhanced commissioningposted by Colin Grist on
Hello all, I am wondering if there are guidelines for what should be included in the eCx final report. Is there a template or list of items that should be included? Thank you, Colin
renovation of multiple non-contiguous parts of an office
CI-2009 MPR2:Must be a complete, permanent building or spaceposted by Agnieszka Rylska on
The owner has a certified office which is located on a few floors of a building. Now he's going to renovate a part of it. On one floor there will be a few non-contiguous parts renovated.
An example of a ducument for Prerequisite 2
ND-Plan-v4 SLLp2:Imperiled species and ecological communitiesposted by oko Yael on
Hello Eliot, We are in a process of preparing the prerequisites documents for the first LEED ND project in Israel. All other prerequisites are technically clear. Prerequisite 2 is somehow softer.
Industrial zone
NC-v4 LTc3:High priority siteposted by Charalampos Giannikopoulos on
Would an officially designated industrial zone which provides tax incentives to businesses be considered as an eligible "high-priority site" to locate a project on? Thank you.
Minimum energy performance calculator
CS-2009 EAp2:Minimum Energy Performanceposted by Giuseppina Amorusi on
Hi everybody I'm working on file "Minimum Energy Performance Calculator" for EAp2 (last version available in Resource on leedonline) which is unlocked. I need to fill in a new system or componen
Scrap as regional material
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by FABIO VIERO on
Hi everyone. Could a scrap of a production process be claimed as regional material, assuming that it is generated and harvested in the same plant (which is, of course less the 160 km from project s
Energy performance vs. Energy Cost
Mid-Rise-v4 EAc1:Annual energy useposted by Eesmyal Santos-Brault on
Hi - It seems that this version of the rating system is targeting energy performance improvement over energy cost budget. Is that right?
Cx for LEED V4
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Anton Paley on
Great flowchart on Cx for V3. Got one for V4?
Thank you USGBC for Energy Performance Calculator
NC-v4 EAp2:Minimum energy performanceposted by Jean Marais on
Thank you USGBC for Energy Performance Calculator. I remember the days before...where you had to make your own more or less whilst fumbling through projects.