Forum quick links
International Project - Case 2 Option 1 or Option 2
EBOM-2009 EAc1:Optimize Energy Performanceposted by Sheena Moses on
Dear all, The case 2 calculator has pointed us towards using Case 2 - Option 1 for our Existing Retail Mall project located outside of the US.
Mall Situation
Retail-CI-v2009 WEc1:Water use reductionposted by Brightworks Sustainability on
If my retail space within a mall is for FTE only, but the retail customers will have access the mall's core restrooms, must these be included in WEc1 calculations?
Baseline system selection
NC-2009 EAp2:Minimum Energy Performanceposted by MKK LEED on
I have a building that is roughly 20,000ft2 of office, plus another 13,000ft2 of underground parking that is heated to 50F.
Commercial Coffee Brewers
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Donald Green on
Under the Energy Star Partner Program there is a listing for Commercial Coffee Brewers V1.0 as of 7/2016 - however when you go to the Find Products there is NO listing for Commercial Coffee Brewers
FAO EToCalc software help
NC-v4 IPc1:Integrative processposted by S. Sachs on
Hello, I'm working on a project in Kuwait and need to achieve the IPc1 credit for water consumption. I've been struggling to use the LEED-recommended ETo calculator tool, produced by the FAO, whi
Compartmentalization
NC-v4 EQp2:Environmental tobacco smoke controlposted by soha yamani on
I am really confused with the language of this credit , can you please clarify the below 1- Does EACH unit have to be sealed and Compartmentalized or only Residential units allowing smoking?
v2009_Minimum Energy Performance Calculator_v06
NC-2009 EAp2:Minimum Energy Performanceposted by Alice chen on
Hi All, I am working on a LEED NC 2009 project and have questions about filling up the v2009_Minimum Energy Performance Calculator_v06. Hope someone can give me some advice.
Minimum Parking Space Exception
Schools-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Anne Agan on
We have a LEED schools project in a suburban setting and the minimum zoning requirement is 114 while the district’s demand for more spaces is causing us to provide 175.
Residential on a university campus.
NC-v4 LTc4:Surrounding density and diverse usesposted by Peter Doo on
How are student residence halls classified on a college campus?
Achieving Same Pilot Credit Twice?
Pilot-Credits IPpc81:Green training for contractors, trades, operators and service workersposted by Patty Lloyd on
Is it acceptable to attempt the same pilot credit on more than one project? For instance, I achieved PC81 on one project. I was wondering if it is acceptable to attempt it on another project?