Dedicated bike lanes

Schools-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Phillip Henning  on 

What is a dedicated bike lane? I have a sidewalk leading to a new elementary school in two different directions. One is approximately 100 feet long from the from the primary access road.

3
Tue Mar 14, 2017, 11:15 pm

overall accuracy, anticipated areas of error susceptibility

NC-2009 EAc5:Measurement and Verification
posted by  Leanne Niu  on 

There is a review comment in my project as follows: It appears that the M&V plan provided does not specify the expected overall accuracy, anticipated areas of error susceptibility, and magnitud

3
Default Avatar
AECOM
LEEDuser Basic Member
0 thumbs up
Tue Mar 14, 2017, 6:28 pm

New materials and resources calculator since 12/01/16

NC-2009 MRc5:Regional Materials
posted by  Guillermo Brunzini  on 

Hello Everybody, Two questions: 1- a project registered in 2012 can use the new materials and resources calculator? 2- What happens with the cutsheets required in previous versions,?

2
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Tue Mar 14, 2017, 3:55 pm
4
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Mon Mar 13, 2017, 10:01 pm

Local voluntary cleanup program - definition

NC-2009 SSc3:Brownfield Redevelopment
posted by  Anna Korinkova  on 

Under Option 1 of the credit, we can pursue EITHER the ASTM E1903-97 Phase II Environmental Site Assessment OR the 'local voluntary cleanup program'.

3
Mon Mar 13, 2017, 4:52 pm

Which flooring system in project scope must be compliant?

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Alessio Zampaglione  on 

Hi everyone, I’m working on an office building project registered under LEED C&S2009 in which there are different flooring systems: .

6
Mon Mar 13, 2017, 3:00 pm

Section 3.10 compliance

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Edgar Arevalo  on 

I'm working on a CI project that we are currently designing VAVs for the floor(s), the main AHUs are not part of the scope of work but they have VFDs.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Mar 13, 2017, 1:30 pm

Interior paint's VOC

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Magda Aghababyan  on 

According to Green Seal Standard GS-11, Paints, 1st Edition, May 20, 1993 the VOC limit for interior flat paint is 50 grams/liter of product minus water.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Mar 13, 2017, 5:04 am

Air testing related to partial renovation per floor

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Julie Barth  on 

I have a client who is asking about air testing for an office building renovation project where small parts of each floor will be renovated.

4
Default Avatar
Industrial Hygienist
Aria Environmental, Inc.
LEEDuser Basic Member
1 thumbs up
Sat Mar 11, 2017, 12:44 am

Help with LEED ND

ND-Plan-v4 MPR1:Must be in a permanent location on existing land
posted by  T J  on 

I'm a beginner and not familiar with the certification process and actual documentation. Where can I get samples or ideas on how to to begin making a simple LEED-ND assessment report including chec

7
Default Avatar
LEEDuser Basic Member
0 thumbs up
Thu Mar 9, 2017, 7:11 pm