Forum quick links
Perimeter Zones Requirements for Warehouse
NC-2009 EAp2:Minimum Energy Performanceposted by Alice chen on
Hi All, I am working on a large warehouse project, which is an open space with the area of 10,000 square meter. This project is targeting at LEED 2009.
Signage for Each Space
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Neumann Monson on
Is it possible to sign a bank of parking spaces in lieu of signing each space individually? If signing a bank with arrows, how far or how many spaces are acceptable.
Which ASHRAE & LEED should I base my simulation on?
NC-2009 EAp2:Minimum Energy Performanceposted by Olaf Dybinski on
Hello, I have a problem with choosing a basis for my simulation. I have a building that was designed in 2015 and is about to be build.
Questions.
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by ethen mcmanus on
Listed below is my list of questions: A) We have several FRESH air handling units and REGULAR air handling units on the roof of our building.
FSC Chain of Command for MR7 and IDP1.5
NC-2009 MRc7:Certified Woodposted by Daniel Meehan on
Looking to achieve 95% FSC for a very small project with the largest wood component being cabinetwork.
Low E Vehicle parking calculation
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Dina Cheyette on
In order to find how many Low E parking stalls we need to provide, we must multiply the number of parking stalls on our site by 5%.
v2009_Minimum Energy Performance Calculator_v6
NC-2009 EAp2:Minimum Energy Performanceposted by Alice chen on
Hi All, I am working on a warehouse project targeting at LEED 2009 certification.
Mosquitos eradicate substance
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Tota Yun on
How I can know if this substance which already used by the contractor in new construction project comply with LEED DELTABAZ 25 EC
Plaza at grade building above.
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Paul Rogers on
I am working on a project where the exterior space consists of an alley way and an outdoor plaza. The outdoor plaza is on columns under the building volume.
Material Calculator
NC-2009 MRc4:Recycled Contentposted by Byrne Lambkin on
I am unable to download the material calculator from the Document Tool Kit