EAp1 Minimum Energy Performance Calculator

NC-2009 EAp2:Minimum Energy Performance
posted by  sriram tetali  on 

Hi, Please help us in solving the Errors in the Minimum Energy Performance Calculator. Project Registered under => LEED NC BD+C -v3 (2009) • Macros are not getting enabled • Shading & Fenes

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Dec 15, 2016, 2:00 am

Performance Period for Recertification

EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitat
posted by  Frances Yang  on 

For EBOM recertification purposes, my project is achieving SSc5 for the first time, through the off-site option. What I know: - For a first certification, we would get a contract to maintain an off

2
Wed Dec 14, 2016, 5:40 pm

Wood Derived Fuel - Used in Home Fireplace

NC-2009 MRc2:Construction Waste Management
posted by  Mario S.  on 

We are working on a project that generates a lot of scrap wood from formwork.

3
Default Avatar
LEEDuser Basic Member
26 thumbs up
Wed Dec 14, 2016, 12:37 am

CxA Same for all Paths?

NC-v4 EAc1:Enhanced commissioning
posted by  Brian Salazar  on 

Does the CxA need to be the same firm/person for Path 2 and Option 2, as it does for Path 1?

4
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Dec 13, 2016, 6:42 pm

Permanently Installed Furniture?

CI-v4 MRc3:Building product disclosure and optimization - environmental product declarations
posted by  Michael Smithing  on 

Option 1 requires that products be permanently installed. Do furniture products installed in a LEED CI project qualify for inclusion in the EPD list?

2
Default Avatar
Project Coordinator, LEED AP, GHG IQ
Teknion Ltd.
LEEDuser Basic Member
3 thumbs up
Tue Dec 13, 2016, 5:49 pm

Value of Enhanced Commissioning

NC-v4 EAc1:Enhanced commissioning
posted by  Hannah Fleck  on 

I have a client who is asking what the value of pursuing enhanced commissioning versus fundamental.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Dec 13, 2016, 1:57 pm

Speculative Retail - No Meters Provided.

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Ciaran McCabe  on 

Im working on a mixed use development that consists of office space and retail units.

2
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Thu Dec 8, 2016, 5:17 pm

Area of all Parking - PI form 2

NC-2009 PIf2:Project Summary Details
posted by  sara todavchick  on 

In PI form 2, I am asked to provide the sq ft of the "area of all parking wtihin the LEED project boundary".

4
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Tue Dec 6, 2016, 5:10 pm

Reference for the Total Daily Uses numbers

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Neshat Sakeena  on 

Hello, I was just wondering if anyone knows the reference or basis of the numbers used in Table 2. Default Fixture Uses, by Occupancy Type in the LEED manual?

4
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Tue Dec 6, 2016, 8:57 am

VOCs content requirements (exterior / wet applied products)

NC-v4 EQc2:Low emitting materials
posted by  Ana García  on 

Hi! I have a question regarding the documentation justifying compliance with VOCs content requirements for: - Wet applied products - Exterior applied products (Healthcare and School). In these ca

4
Architectural Green Method
LEEDuser Basic Member
1 thumbs up
Fri Dec 2, 2016, 5:31 pm