Forum quick links
Calculating MRc4 - Recycable Material Credits
NC-2009 MRc4:Recycled Contentposted by Richard Metts on
Please help me to clarify the following cost scenario's as they relate to calculating the MRc4 Material Credits. 1) Fabricated Structural Steel - Do you use the whole cost for the fabricated steel
Energy Star Portfolio Manager
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Pablo Fortunato Suarez on
I had recently checked the Energy Star Portfolio Manager website and it seems to be down. It has been a few days.
VOCs from treated wood used inside the weatherproofing
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Debra a. Lombard on
LEED NC v2009 Comml Bldg Does LEED concern itself with VOCs from treated wood used inside the weatherproofing? If so, what are the VOCs limits for treated wood?
Performance Metric for Powered Equipment
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by LUCY WILLIAMS on
The LEED User "Powered Equipment Inventory" Worksheet, located under the "Documentation Toolkit" tab provides guidance on performance metrics as follows: How to document performance based on the ma
Data sets must be compliant with ISO 14044
NC-v4 MRc1:Building life-cycle impact reductionposted by Dionisio Franca on
Hi. I'm trying to understand what is a data set compliant with ISO 14044.
SSpc14 Walkable project Site
Pilot-Credits PC14:Walkable Streetsposted by R Jones on
I have recently applied this criteria to a Major Refurbishment project in an Urban setting. Has anyone looked at using this pilot credit for a Commercial interiors project?
Compliance Documents for EAp2 and EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Alice chen on
Hi all, I am working on my first LEED modelling work with IES and wondering what documents are needed for the submission for EAp2 and EAc1.
Equipment relocation
CI-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
For a project relocation which may relocate existing equipment accordingly could this equipment be excluded from calculations as this has been purchased previously?
Tracking mixed recyclables off-site
CS-2009 MRc2:Construction Waste Managementposted by Maria Luisa Verticchio on
The job site we are able to begin is inner-city with many restrictions, especially square footage of actual site. There is not enough space to set up multiple bins.
Covered Roof Terrace and Green Roof
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Ilana Judah on
Two questions: 1.