Forum quick links
Planned bus stop
CS-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by David Lazaro on
Hello, We are working on a project in an undeveloped industrial area. It is a group of three very large logistic buildings, with warehouses and offices.
LEED 2009 DES Projects - Rule Change - August 2016
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Edwards on
I'm working on a project on a collegiate campus that utilizes district chilled water and steam, and I have run into what appears to be a rule change that was snuck into the v2009 Minimum Energy Per
Material and Resource Calculator
CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishingsposted by Angela Feulner on
Can someone please explain the difference between 'Total sustainable materials cost' and 'Total materials cost' on the Material and Resource Calculator?
Laundry Chemical
EBOM-v4 EQc7:Green cleaning - products and materialsposted by VISHESH AGARWAL on
Cleaning and Degreasing- CCD-110 is this credit include the laundry cleaning product come under the cleaning and degreasing category.
hand watering for irrigation
EBOM-2009 WEc3:Water Efficient Landscapingposted by cathy keagle on
What irrigation efficiency should be used for hand watering?
carpet tile adhesive tabs
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Elizabeth Eason on
We have carpet tiles attached to the floor with adhesive tabs at the corners rather than with a fluid adhesive. Are the adhesive tabs to be listed in the adhesives and sealants table?
Green Power Contract through vendor
Retail-NC-v4 EAc7:Green power and carbon offsetsposted by Joanna Ruiz on
I am working with a corporate client, who uses a third party company to seek and procure all their utility contracts.
Authority having Jurisdiction
NC-v4 EAp1:Fundamental commissioning and verificationposted by Pam Lynch on
I just took a LEED GA pratice exam and do not understand the answer to this question: The ‘Authority having Jurisdiction’ is responsible for which of the following? a) Completing the commissioning
Contract through Design Team - conflicting information
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Rory Cousino on
I am going to ask a question that is probably been answered before - but I cannot find the simple answer. Can the CXA be contracted through / to the Design Team?
FSC-certified bamboo
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jason Grant on
LEED Interpretation ID# 2535 ruled that, under LEED 2009, FSC-certified bamboo could be counted under both MRc6 (Rapidly Renewable Materials) and MRc7 (FSC Certified Wood).