Exemplary Performance

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Allen Cornett  on 

Can exemplary performance be documented by combining Option 1 and Option 2?

2
Fri Aug 12, 2016, 10:27 pm

Finishing materials will be specified by future tenant

CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Gabriela Hernández Castillo  on 

In our project ownership will provide flooring finishings on commun area, but the leasable area will remain only as concrete so future tenant will install its own flooring. Do we need to include t

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Fri Aug 12, 2016, 9:27 pm

Comments on Stair Distance Requirements

Pilot-Credits EQpc78:Design for active occupants
posted by  Jeremy Knoll  on 

Like Nate, I also like the intentions of this credit.

7
senior design professional
HOK
LEEDuser Basic Member
0 thumbs up
Fri Aug 12, 2016, 6:39 pm

n/a

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Anastasia Makarenko  on 

Dear all, our project is being certified under LEED v3 NC. at the Preliminary Design Review Stage we've divided users into occupant groups in accordance with their functionality - office workers, k

2
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Fri Aug 12, 2016, 11:59 am

Exterior lighting classification -

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Ricardo Sá  on 

Hi, I’m currently working on a LEED 2009-CI project applied to a hypermarket and I’m having doubts in classifying some surfaces according to table 9.4.5 of ASHRAE 90.1 2007 (“Lighting Power Densi

2
Thu Aug 11, 2016, 9:12 am

VOC product category

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  soha yamani  on 

we are trying to identify a product to check its VOC limit, however, the supplier identified the product as Prefabricated Architectural Multi- Component and touch up from RULE 1107.

2
Tue Aug 9, 2016, 10:52 pm

0.5m margin and work-space adjacent to the glassed facade

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Anna Korinkova  on 

Hello, For dayligting simulations, there is usually a 0.5m margin applied around the perimeter of the room, excluding the area from the assessment.

4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Tue Aug 9, 2016, 3:53 pm

Measurement & Verification and PI Form 1

NC-2009 EAc5:Measurement and Verification
posted by  Ivan Romero  on 

I'm still not completely clear on the reporting commitment for energy and water usage data.

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Aug 9, 2016, 3:10 pm

Simulate Spatial Daylight Autonomy and Annual Sunlight Exposure

NC-v4 EQc7:Daylight
posted by  Julien Richard  on 

Hello everyone, Could someone tell what software is capable of simulating the sDA and ASE according to IES LM 83 methodology ?

9
Tue Aug 9, 2016, 2:42 pm

energy modeling

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Bethany Beers  on 

We have a tenant fit out of a single floor in an 8 story building. The new design is an energy efficient chilled beam system, and the central plant remains unchanged.

7
Tue Aug 9, 2016, 2:21 pm