Operable windows

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Charalampos Giannikopoulos  on 

For an office space with 100 individual working spaces the project team has used operable windows in order to provide thermal comfort control.

11
Mon Jun 27, 2016, 7:32 pm

R-438A

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  Paula Hernandez  on 

Hi, We are working in a project that will have kitchen refrigerators, some of this equipment has refrigerant R-438A. I believe that this refrigerant complies with the prerequisite, since it is a HF

2
Sustainability Specialist
Gensler
LEEDuser Basic Member
66 thumbs up
Mon Jun 27, 2016, 7:18 pm

Smart vs. Florscore

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Robert Shields  on 

For flooring products, for example VCT, is Smart Certification the equivalent to Florscore for LEED Certification purposes?

3
Default Avatar
LEED AP
R.S. Mowery & Sons, Inc.
LEEDuser Basic Member
2 thumbs up
Mon Jun 27, 2016, 2:06 pm

Master's Research Survey

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Vibha Pai  on 

I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.

2
Sun Jun 26, 2016, 3:02 pm

Campus PV dedicated - not connected - to building requires Cx?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Joyce Kelly  on 

A portion of a nearby, existing campus PV system has been dedicated - not connected - to our building.

3
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Fri Jun 24, 2016, 5:34 pm

Solar energy used with previous LEED project credit

NC-2009 EAc2:On-Site Renewable Energy
posted by  Zane Lichtneger  on 

We have a solar farm on our site that generates about 1.7 million kWh of electricity per year. The array is 100% grid tied selling all energy back to the public utility.

3
Default Avatar
Sustainability Analyst
SAS Institute Inc.
LEEDuser Premium Member
5 thumbs up
Fri Jun 24, 2016, 4:11 pm

Timing of ASHRAE Level I & II & BAS System Install

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Marie Kirk  on 

We are going for LEED EBOM v 2009 and need to finish the process by Spring 2017. An engineering firm is getting ready to do an ASHRAE Level I & II audit for us to receive the EA Credit 2.1.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Thu Jun 23, 2016, 5:02 pm

Energy Modeling

NC-v4 EAp2:Minimum energy performance
posted by  Muzamil Rafique  on 

Dear All, i am doing a energy simulation for bank building. software have no option LEED Rating V4. It have only LEED 2009 rating system.

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jun 23, 2016, 4:07 pm

survey after 18 mos.

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  PATRICK HILLIER  on 

So we are scraping for a few more points that we lost in our CD review. It is now 18+ mos. after occupancy - can this credit still be obtained?

2
Thu Jun 23, 2016, 3:49 pm

Energy Modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Muzamil Rafique  on 

Hi Marcus, I am doing energy modelling for a Bank building. Total Building Area is 55,600 SFT.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jun 23, 2016, 3:26 pm