Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Sport Flooring Vent Cove Base

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Michelle Rosenberger  on 

I have a YMCA that is installing wood flooring for their gymnasium. They are required to install vent cove base with this kind of floor.

2
Tue Jul 19, 2016, 9:40 pm

ASHRAE Baseline Constructions

NC-2009 EAc1:Optimize Energy Performance
posted by  Alice chen  on 

Hi All, I am working on a large warehouse building with a small office building on the site. The warehouse is heated only, so I suppose that is semiheated space, is that right? While the office

4
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Premium Member
44 thumbs up
Tue Jul 19, 2016, 4:43 pm

Daylight controls

CI-v4 EAp2:Minimum energy performance
posted by  Gabriela Crespo  on 

Dear all, We are working on a project to be certified CI v4. The use is a software development office, the building is 100% glazing in a very hot climate.

2
Default Avatar
Building Systems Commissioning Engineer
Empirical Engineering, LLC
LEEDuser Basic Member
14 thumbs up
Mon Jul 18, 2016, 6:46 pm

IDc1 Innovation - Green Cleaning LEED NC 2009

NC-2009 IDc1:Innovation in Design
posted by  William Brown  on 

We received feedback from GBCI that our Green Cleaning Policy lacks "Standard cleaning procedures to protect vulnerable building occupants.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Jul 15, 2016, 7:27 pm

Fire Station water calculations

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Heather Appell  on 

I am currently working on a Fire Station that has a total of 18 employees. However, each shift is 24 hours long and it's 6 employees per shift.

2
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
104 thumbs up
Thu Jul 14, 2016, 6:38 am

Operable windows & mechanically ventilated space

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Charalampos Giannikopoulos  on 

For a mechanically ventilated building for which the project team has attempted compliance with IEQc6.2 with operable windows the reviewer has commented at IEQp1 that the project may demonstrate co

2
Wed Jul 13, 2016, 3:44 pm

Form

NC-2009 EAc2:On-Site Renewable Energy
posted by  GISELA FARHAT DE ARAUJO  on 

The EAC2 Form asks for "Annual Renewable Energy Cost". You said in a post that is "It is the avoided energy cost associated with the renewables at the virtual rate from the Proposed model.

5
Wed Jul 13, 2016, 2:41 pm

Eac2 form

NC-2009 EAc2:On-Site Renewable Energy
posted by  GISELA FARHAT DE ARAUJO  on 

Hi. I have a 34,2 Kw solar system that generate 49.425 kWh/year. I need help to fill the form: 1- In table: Renewable energy - what information should I put in the item "Annual Energy Cost"?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Jul 13, 2016, 10:56 am

Interpretation Problem

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Maria Isabel Conde  on 

We have a problem with the interpretation of the information necessary to apply for this credit.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Jul 12, 2016, 6:45 pm

Shared solar array on a campus with separate utility feeds

NC-2009 EAc2:On-Site Renewable Energy
posted by  Rebecca Bryant  on 

We are working on a hospitality project that is attempting LEED Gold, and is part of a larger campus.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Jul 12, 2016, 6:42 pm