Forum quick links
Off-Site Restoration
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by spencer michael on
Would off-site restoration count for this point? There is an earlier question regarding this on Jan 26, 2016 that hasn't been responded to yet.
Off Site restoration for previously developed area
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by DI LU on
We are currently working on obtaining LEED certification for one of our projects: Coppin State University Science and Technology Center, Baltimore, MD, an urban campus.
LPE Option
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Logan Dorrell on
Where is the form for the LPE (Licensed Professional Exemption) to fill out and submit for NC 2009?
Hazardous Gas or Chemical Definition / Resource?
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maggie Hogan Skaug on
What is the LEED definition of Hazardous Gas or Chemical?
Solar Water Heating System
NC-2009 EAc2:On-Site Renewable Energyposted by Kalyan Nishtala on
Hi, Has anyone found a reliable calculator for estimating savings from a solar water heating system that has been submitted and accepted by USGBC reviewers.
Project Mexico
NC-2009 RPc1:Regional Priorityposted by Alejandro Macias on
Hi! I´m using this link http://www.usgbc.org/rpc to identify the regional priority credits on a project near Oaxaca, Mexico. But if I select BD+C :NC, v2009, Mexico the website send me an error .
Natural Ventilation in Apartment Buildings
NC-2009 IEQp1:Minimum IAQ Performanceposted by Sunayana Jain on
I have naturally ventilated apartment units. Apartment's inner most wall distance from the exterior window is 33’. Interior most side of the apartment has toilet and kitchenette.
Chiller Usage for LEED & Non LEED Building
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All we have one chillier with a capacity of 1000 Tons. But it is served the Cooling to two building (LEED & Non LEED) one is LEED Building and another one is non LEED scope In this case
number of showers to provide
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by cathy keagle on
When you are determining the number of showers to provide per FTEs and the total required for example is 3.
Looking for a source for no voc plywood floor sheathing
Mid-Rise-v4 EQc7:Low-emitting productsposted by Phil Vanderloo on
Can anyone direct me to a source for compliant 1 1/8" T&G plywood floor sheathing. Also hoping to find compliant mdf base and door casings. Thank You