System 4 for Data Center
NC-2009 EAp2:Minimum Energy Performanceposted by Ameet AA on
Hello, I'm modelling a low-rise data center. According to Appendix G, I should use system 4 (rooftop package heat pump) for reference model.
Calculation clarification
NC-2009 SSc2:Development Density and Community Connectivityposted by BABAR MEHMOOD on
The building contains 2 below ground basements and 3 office floors above ground, should we add the basement floor area in the total area of the building for the building density calculation??
Service Hot Water & Heat recovery condensers
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In the project we are modeling, the Proposed design has applied a chiller’s condenser heat recovery without this to be required by the prescriptive requirement (6.5.6.2).
Elevator lobby as vestibule - ASHRAE Standard 90.1
CS-2009 EAp2:Minimum Energy Performanceposted by Paul Deinhofer on
Hi, I have a question concerning the the function of a elevator lobby as a vestibule. Regarding to Standard 90.1, every building entrance that separate cond.
Energy Model using ECB Method with Existing AHU
CI-2009 EAp2:Minimum Energy Performanceposted by Mark Stromberg on
We are pursuing LEED certification for small project in which some offices are converted to open offices, break room and reception area in an existing building.
Are parapets considered roof area?
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Renee Shirey on
In calculating compliant roof area to total roof area, is the SF associated with parapets considered roof area?
CHP-generated electricity
NC-2009 EAp2:Minimum Energy Performanceposted by Qian Tang on
Dear all, we are working on a project which be supplied from a DES with CHP. The source of CHP is not renewable energy but natural gas.
IEQc7.2
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Alex Brown on
Where can I get a sample Thermal Environment Survey Form to upload to satisfy the LEED Reviewer?
Airflow measuring devices on MUA
EBOM-2009 IEQc1.2:IAQ Best Management Practices—Outdoor Air Delivery Monitoringposted by Trevor Gilbert on
I am working on a office building that has installed airflow measuring devices on the central Makeup Air Unit which serve fresh air to a compartment unit on each of the buildings floors via a fresh
Cold Climate
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Erin Holdenried on
Does anybody have experience using an alternate compliance path for a project in a cold climate?