Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

basic soil tests at design phase

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Charline SEYTIER  on 

Dear All, We are pursuing option 1 in one of our projects and want to submit it for Design Submission as this is a Design Credit. However Documentation requires "basic soils test(s) to demonstrate

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Apr 11, 2016, 3:24 pm

Construction Waste Management-Multiple Buildings

NC-2009 MRc2:Construction Waste Management
posted by  Ian McCall  on 

Dear LEED-ers, Scenario : One single project, consisting of an office building (LEED Ceritified) & hotel building (NOT LEED Certified) in a very built up area with limited space.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Apr 11, 2016, 12:25 am

How to earn AP with specialty?

Healthcare-v4 INc2:LEED Accredited Professional
posted by  Joyce Kelly  on 

How does one earn LEED AP with specialty? I would like to earn the right to be LEED AP on Healthcare projects in the future. Is there a specialty exam to take? I am just BD+C.

2
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Sun Apr 10, 2016, 5:03 pm

EAP2 required HAP input summary

NC-2009 EAp2:Minimum Energy Performance
posted by  Eric Wright  on 

For the EAP2 upload EAP2-14 LEED is asking for the modeling software "input summary." What specific input summaries are required for Carrier HAP? I am modeling a building over 100,000 sq ft.

7
Enginneer
T&T Green
LEEDuser Basic Member
9 thumbs up
Sat Apr 9, 2016, 10:20 pm

IEQ Credit 5 - Supply Air Recirculation

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Raj G  on 

In our project, we have a janitor room adjacent to a toilet and these both rooms have exhaust duct which are combined together & exhausted directly to outside without re circulation. But, we h

2
Sat Apr 9, 2016, 9:01 pm

Complex Occupancy Upload PIf3-1

NC-2009 PIf3:Occupant and Usage Data
posted by  Jeannie Rueter  on 

The requirement for this upload is to provide project FTE calculations including daily and annual patterns.

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Fri Apr 8, 2016, 3:24 pm

Question about terrace without roof

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Haoyang Li  on 

Hi all, I am working on a commercial interior university restaurant project. There is a non-roof terrace at 3rd floor.

4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Apr 7, 2016, 5:29 pm

baseboard

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Anastasia Makarenko  on 

Does anyone know how to treat skirting board applying to requirements of this credit? Does it need to be floorscore/ CA section 01350?

2
Products and materials specialist
BuildingGreen
LEEDuser Expert
21 thumbs up
Thu Apr 7, 2016, 9:47 am

What is a wetland or naturally designed pond per credit language

CS-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Landry Watson  on 

Credit language clearly indicates that wetlands and naturally designed ponds can count as long as their sides are vegetated and their gradient no more than 1:4.

3
Assistant Vice President - Sustainability
Alexandria Real Estate Equities
LEEDuser Premium Member
26 thumbs up
Thu Apr 7, 2016, 2:39 am

PC14 closed?

Pilot-Credits PC14:Walkable Streets
posted by  Jens Apel  on 

As stated by Melissa Merryweather below the link to the survey is broken.

5
Default Avatar
Sustainability Team Member
M+A Architects
LEEDuser Basic Member
1 thumbs up
Wed Apr 6, 2016, 10:13 pm