Healthcare-v2009 IEQp1:Minimum indoor air quality performanceposted by Gabriela Crespo on
Hi! I have a question regarding the ventilation requirement for the Linen Area, according to the Space Matrix file, there needs to be Outdoor air for this space.
Outside Mat
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Waterset CDD on
Hello, We have an outside mat that needs to be replaced. It was actually glued down during instillation. I would like to know the following: 1.
Museum Exhibit Lighting
NC-2009 EAc1:Optimize Energy Performanceposted by Christian Kaltreider on
I am modeling a museum with separately controlled exhibit lighting. I am using Section 9.6 of 90.1 2007 (space by space) to calculate my baseline general lighting power densities.
Waste Oil Fuel
NC-2009 EAp2:Minimum Energy Performanceposted by Michael Daly on
I am working on a project that has two parts to the building. There is an office component and a shop component. The office is going to be heated and cooled with a VRF system.
Perimeter protection
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Martin Meehan on
We have a number of LEED projects in infill locations in Ireland. Since we don't really have a standard code for site Erosion and Sedimentation we have to stick to the U.S.
Base Build HVAC Plant Requirements
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ciaran McCabe on
Hi, I am working on a CI 2009 fit out where the the landlord services such as heating pumps, boilers, AHU's and chillers are already installed.
SSc4.3 Low-Emitting and Fuel-Efficient Vehicles Parking
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Shad Traylor on
SSc4.3 credit: Low-Emitting and Fuel-Efficient Vehicles, The project is located on a large campus, do the preferred FE/LE parking spaces need to be located within the LEED project boundary? And if
Open Space Accessibility
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Ilana Judah on
We have a Residential project in New York City (complies with credit SS 2), and the ground level is a small amount of retail and a community space.
Amount of offset in multi tenanted building
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Peter Doo on
If tenants are individually metered, are the percentages of offset calculated on common area meter usage only?
New ASHRAE compliance path
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Melton on
Is this new compliance path likely to have any effect, direct or indirect, on prereq/credit documentation?