Forum quick links
Below Grade levels - excluded?
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Maya Karkour on
Hello, I have a question regarding below grade levels which have regularly occupied spaces If we refer to the excel sheet "HC Supplemental Daylight and Views Calculation Spreadsheet", it is specifi
Single Building Certification_LEED New Construction 2009
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Aswin M on
We have a Garment factory project that has three blocks with connectivity bridge. The three blocks are namely Cutting block, Sewing block, and Fabric store block.
Thinset Epoxy Terrazzo poured floor.
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Nelina Loiselle on
We have project using an epoxy terrazzo poured floor where the VOC's for both components are 0 g/L. I understand that these would be listed in IEQc4.2 under floor coatings.
4 point mandatory minimum
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
Recently an addenda was published to refer that "for projects that register after XX/XX/XX and are subject to the four point mandatory minimum, demonstrate an 18% improvement in the proposed buildi
The amount of REC's necessary if onsite solar credits are sold
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Edmée Knight on
My buildings roof is covered in solar panels that generate at least 20% of the building's annual energy.
Credit Form Problems
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by James Keohane on
I am having difficulty demonstrating compliance for Option C Occupancy Sensors.
Major Renovation Building Energy Modelling
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All We are currently working on a Major Renovation Building.
Hangar
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gustavo De las Heras Izquierdo on
My project is a 93,000 sf open-plan hangar. We are designing grills on walls that count for 4% of the floor area on 2 opposite facades to induce crossed-ventilation.
How to calculate capacity for commercial ice makers?
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Lindsay Austrom on
I have a project with a commercial kitchen, so we're gathering info on all of the walk-in coolers, freezers, etc.
EA Credit 4: Enhanced Refrigerant Management
NC-2009 EAc4:Enhanced Refrigerant Managementposted by John Pugh on
Hello, Was just wondering if someone could shed some light on the Refrigerant Charge and how I go about finding it? I am using R-410A as the refrigerant. Thanks.