Forum quick links
Can Technical School's Automotive Dept reserved spaces be excluded?
Schools-NC-v4.1 LTc8:Electric Vehiclesposted by Danielle Waters on
Our project is a Technical High School with an Automotive Department, which is reserving 35-40 parking spaces for their own storage of to-be-fixed vehicles. Can these spaces be treated similar
Getting Credit for Demand Control Ventilation in the Optimize Energy Performance credit
NC-v4 EAc2:Optimize energy performanceposted by Mark Terpstra on
I have a project with a CO2 sensor in the return air duct of a workshop in a school.
Regularly Occupied
NC-v4.1 EQc9:Acoustic Performanceposted by Martha Norbeck on
The credit language reads all "occupied spaces." Is that really the intent? Or is it all "REGULARLY occupied" spaces?
Baseline Lighting Control
CI-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
I am modeling a space which has some spaces which have area greater than 250 ft2, now this is an office space and using building area method LPD comes out to be 0.9 W/ft2, and these spaces ar
MEP-Calculator for LEED ID+C
CI-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
For MEP Calculator when Inputting the capacity of the chiller and AHU should I input the values that I am getting from my model or input the values from the CD Document which represent the capacity
Water Feature Include or Exclude?
EBOM-v4.1 WEc1:Water Performanceposted by Summer Minchew on
Has anyone had experience with including vs excluding site water features (fountains)?
Retail basline HVAC
CS-v4 EAc2:Optimize energy performanceposted by Julio Fernandez Amodia on
Hi to all,
On-site Renewable Energy
Warehouses-NC-v4 EAc5:Renewable energy productionposted by Salomee Hinque on
Hi all,
For a new construction warehouse project, going for LEED Platinum and LEED Zero Carbon:
Modeling DHW system for CI project
CI-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
Hi,
FTE for Data center
Data-Centers-NC-v4 LTc6:Bicycle facilitiesposted by Carlos Bueno on
What would be the correct FTE for a Data Center building?