Forum quick links
Title-24 2008 vs Title-24 2005
NC-2009 EAp2:Minimum Energy Performanceposted by Thomas Burnham on
Credit language requires using ASHRAE 90.1-2007 (or Title-24 2005 for California projects). Can we use Title-24 2008 instead of the Title-24 2005 version for v3 projects?
Existing Building Fenestration
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
According to ASHRAE 90.1-2007 Table G3.1.5 (f) for existing building envelopes, the baseline building design shall reflect existing conditions prior to any revisions that are part of the scope of w
Domestic Hot Water Consumption
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Dear Forum, If we do not want to show any energy savings associated with hot water pumps for domestic hot water system, Section G3.1-11 states that service water loads and usage shall be the same
Office tower on a shopping center "plinth"
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Ricardo Sá on
I'm working on a project that consists of an office building tower that will be erected on top of a shopping center built 20 years ago.
Tenant Guidelines for CS spaces within NC
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Melanie Silver on
We are working on a large residential project that has two very tiny retail spaces at the base (one less than 500 sf, and the other about 1500 sf).
rust oleum magnetic primer
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Anastasia Makarenko on
Dear all, could anyone please help me define the type of the following material - Rust oleum Magnetic primer which is used to create magnetic surface at the wall.
whiteboard paint
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Craig Flandermeyer on
What category would whiteboard paint fall under? Plan to use IdeaPaint which has a COC of 325 g/L, don't want to calculate the VOC budget method if not necessary. Thanks!
Framed assembly U-value calculated by WinISO 2D Software
NC-2009 EAp2:Minimum Energy Performanceposted by Mayank Bhatnagar on
Hi, As per reviewer comment the calculation for U-value of whole window assembly (including frame) used for the Proposed case windows can be demonstrated by different method such as NFRC rating, Wi
ESC gap between the excavation phase and construction phase
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Meghan Ward on
I am working on a 2-building campus project where an ESC plan was implemented during excavations phase (bulk earthworks) of the whole campus.
"open bottom planters"
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Charles Nepps on
I know this has come up before, but haven't been able to find a precise answer. What exactly is an open bottom planter?