Forum quick links
Checklist states 2 points possible
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Parker williams on
Are you allowed to do both options for this credit? 2 points possible or 1?
Crade to Gate or Cradle to Grave
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Christine Richey on
The company I work for is just in the beginning stages of creating a type III EPD for our engineered wood products.
FSC Mix cabinet with Recycled content
NC-2009 MRc7:Certified Woodposted by Indochine Engineering VN on
Hi, one kitchen supplier showed me their CoC certificate that says the status of material is FSC Mix and they also confirmed their cabinet products have 25% recycled content.
Light meter phone apps
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ben Thompson on
Hi all, I'm going to do the measurement method for the first time, and was looking into using a light meter app on my phone to do it- would this be acceptable?
Scope of the credit
posted by Frantisek Macholda on
Hello, I am not sure if this credit covers the equipment purchased for building management purposes only (i.e.
Alternatives for Option 1. material ingredient reporting
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Jane Wigren on
For Projects outside of the United States using national systems for creating a complete Product content inventory (e.g.
Space Usage - Occupant Type
NC-2009 PIf3:Occupant and Usage Dataposted by Akshat Patel on
I'm having trouble deciding what to mark for the first item in the form: Occupant Type. My project is a hotel new construction.
Runoff rate and runoff volume definition
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Noriko Nagazumi on
Michael, Our local regulations usually require rainwater collection facilities that only shift the total runoff between storms instead of infiltrating or reusing the rainwater. Is there a common
v2009v4_Minimum IAQ Performance Calculator_v02 - Any Experience?
NC-2009 IEQp1:Minimum IAQ Performanceposted by O Moltay on
Dear Members, Do you any experience with the v2009v4_Minimum IAQ Performance Calculator_v02 spreadsheet found under Credit Resources for IEQp1?
cutsheets
NC-2009 MRc5:Regional Materialsposted by Jian Hui Liu on
Clearly i know the project team should provide cutsheets for the materials to support regional materials claims,but i cannot get the meaning of "cutsheets".Which kind of information the cutsheets s