Forum quick links
Auto Dealership
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Vince Capogna on
Would exterior on-site inventory/display parking of new cars for sale at an auto dealership count towards the total number of parking spots provided?
Equipment Capacities
CS-2009 EAp2:Minimum Energy Performanceposted by Giuseppina Amorusi on
I am working on simulation with Carrier's HAP. I have to model baseline system 8 (VAV with PFB boxes) in accordance to ASHRAE 90.1 Appendix G 2007.
Juvenile Detention Center - Lighting Control
NC-v4 EQc6:Interior lightingposted by Michelle Bombeck on
Hello all - We are working on a juvenile detention center and are trying to find a way to comply with EQc6.2.
Area requirements
Pilot-Credits SSpc82:Local food productionposted by Noriko Nagazumi on
The requirements on the credit (BD+C) on the top of the page show: 1. At least 10% of the site’s vegetated area 2. At least 1,500 square feet of hydroponic area 3.
Green tags and Tradable Renewable Credits (TRCs)?
NC-v4 EAc7:Green power and carbon offsetsposted by Jen Roberts on
Can green tags or TRCs can be used to substitute RECs? Also, I am having a hard time understanding the concept of how RECs work.
LEED 2009 Energy Updates
NC-2009 EAc1:Optimize Energy Performanceposted by Theresa Lehman on
Did anyone see the that USGBC has launched a set of proposals to increase the energy minimums for LEED v2009, which is open for project registration until October 31, 2016.
EAC4 Template Life Cycle
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Jesus Deras on
For refrigeration equipment(Freezers/coolers etc etc) what is the life expectancy that should be put into the EAC4 template?
Relocated / Occupant owned task lighting
CI-2009 EAp2:Minimum Energy Performanceposted by Michael Smithing on
Our project does not include task lighting; however several users have brought existing task lighting with them from the previous premises to the new premises.
Previously developed land must comply with 100-year flood?
NC-2009 SSc1:Site Selectionposted by Ricardo Sá on
The latest version of the LEED template for this credit (v5.0) has a change regarding how the compliance is demonstrated when the projects are outside U.S.
Power over Ethernet (PoE) telephones.
CI-2009 EAp2:Minimum Energy Performanceposted by Olga Yuil on
Power over Ethernet (PoE) telephones: Are they required to be included within EAp2 equipment? Any advice and suggestions will be greatly appreciated.