Forum quick links
Shared building electricity meter
EBOM-v4 EAp2:Minimum energy performanceposted by LEED Pro Consultant on
We have a building which shares electricity meter with an adjacent building, only one building will be intended for certification, it is possible to identify the percentage of consumption in every
small DES
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
For a preliminary review I modeled a building that is heated and cooled by four geothermal heat pumps that are located in a technical room within the building.
Pilot Credit Closed
Pilot-Credits EApc8:Demand responseposted by Haley Duncan on
Hi, It looks like USGBC has closed this pilot credit to NC 2009 projects.
Submitting this point in v2009
EBOM-v4 EQc9:Integrated pest managementposted by Tracy Smith on
I am submitting a project under v2009, but my pest control contractor has been encouraging us to switch to the v4 pest control guidelines instead of the v2009.
Upload requirements for EA Cr 4: Enhanced Refrigerant Management
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Kathy Wislocky on
Hi, I'm hoping to get some feedback on what is actually required to be uploaded in support of table 4-1.
New purchases Energy Star
Retail-CI-v2009 EAp2:Minimum energy performanceposted by Cesar Ruiz on
In the EAp2 and EAc1.4 for LEED CI v2009, you established that projects may include only new equipment and appliances purchased for the LEED-CI scope of work in the list for Energy Star rated equip
Refrigerant HFO 1234
NC-2009 EAc4:Enhanced Refrigerant Managementposted by CT G on
Hi all, Is it possible to use the refrigerant R-1234 (HFO) to replace the R-134 in a centrifugal chiller? It has low GWP (around 4 or 5) and zero ODP, but it is not in the LEED online form nor in
VOC Content in VOC Budget Method
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Aber Alvi on
For a project located outside US, should the VOC content of a paint or coating not tested as per SCAQMD or Green Seal or CARB Standards be included in the VOC budget method?
Humidity Calculations at Peak Conditions
Schools-2009 IEQc10:Mold Preventionposted by James Keohane on
I am in the process or completing IEQc10 credit form. The credit form lists a required upload as "Upload IEQ10c10-1.
Fernanda Palacios
CS-2009 EAc6:Green Powerposted by Alessandra Nasi on
Hello, Our company has a Project (in Santiago Chile) and we have a question about the additional requirement calculation for CS Core and Shell Credit 6, Green Power. The credit says that gross SF f